GO Train

Barrie Line GO Expansion

We're transforming GO Transit to bring more frequent two-way, all-day service to the Barrie Line.

Bloor-Lansdowne GO Station TPAP

Situated on Bloor Street West, just west of St. Helen’s Avenue, on the Barrie Rail Corridor, the new station will feature bike parking, an entrance at Bloor Street (lower) level and at platform (upper) level, a plaza and landscaping at the platform level, one tunnel connecting East and West platforms and a multi-use path from the Davenport Diamond greenway north of Bloor Street to Dundas Street. This multi-use path will be routed adjacent to the Barrie GO Rail Corridor and will provide connection to the West Toronto Railpath.