Français
GO Train

Community Documents

Aurora GO Station

Date Document Name Type of Information File Size
2021 GO Expansion: Aurora GO Backgrounder [pdf] 5.36 MB

Back to top

Barrie Line

Date Document Name Type of Information File Size
08/03/2022 Barrie Double Track Enabling Works - Nighttime Works - March to April 2022 [pdf] 237 KB
2021 GO Expansion: Vaughan [pdf] 4.58 MB
2019 Public Meeting #5 (November 28, 2019) [pdf] 100 KB
2019 Public Meeting #5 Presentation [pdf] 151 KB
2019 Notice of Public Meeting #4 (November 12, 2019) [pdf] 114 KB
2019 Notice of Public Meeting #4 Presentation [pdf] 200 KB
2017 Station Improvements: Pedestrian Tunnel Installation at Rutherford [pdf] 232 KB
2017 Barrie Corridor Rail Tie Replacement - Summer 2017 [pdf] 190 KB
2017 Station Improvements: Pedestrian Tunnel Installation at Maple [pdf] 200 KB
2017 Switch Installation [pdf] 206 KB
2017 Preferred Design Rail Corridor - Legend and Plans [pdf] 1.6 MB
2017 Preferred Design Rail Corridor - Aurora [pdf] 72.29 MB
2017 Preferred Design Rail Corridor - Barrie [pdf] 35.73 MB
2017 Preferred Design Rail Corridor - Bradford West Gwillimbury [pdf] 63.18 MB
2017 Preferred Design Rail Corridor - East Gwillimbury [pdf] 61.33 MB
2017 Preferred Design Rail Corridor - Innisfil [pdf] 93.6 MB
2017 Preferred Design Rail Corridor - King [pdf] 52.30 MB
2017 Preferred Design Rail Corridor - Newmarket [pdf] 32.96 MB
2017 Preferred Design Rail Corridor - Toronto [pdf] 75.83 MB
2017 Preferred Design Rail Corridor - Vaughan [pdf] 69.99 MB
2017 Notice of Commencement and Public Engagement (May 11, 2017) [pdf] 655 KB
2017 Notice of Public Meeting #3 (Update York South-Weston - February 6, 2017) [pdf] 4.3 MB
2016 Notice of Public Meeting #2 (November 2016) [pdf] 253 KB
2016 PIC #2 Summary Report [pdf] 11.50 MB
2016 Meeting Presentation - City of Toronto [pdf] 2.92 MB
2016 Meeting Presentation - Barrie [pdf] 3.23 MB
2016 Meeting Presentation - York Region [pdf] 5.7 MB
2016 Story Boards - City of Toronto [pdf] 879 KB
2016 Story Boards - Barrie [pdf] 1.21 MB
2016 Story Boards - York Region [pdf] 1.55 MB
2016 PIC #1 Summary Report [pdf] 15.79 MB
2016 Notice of Public Meeting (Town of Bradford West Gwillimbury) - Proposed Train Layover Facility [pdf] 149 KB
2016 Bradford West Gwillimbury Public Meeting – Story Boards [pdf] 6.76 MB
2016 Bradford West Gwillimbury Public Meeting - Summary Report [pdf] 6.51 MB
2016 Station Improvements: Pedestrian Tunnels at Maple [pdf] 133 KB
2016 Station Improvements: Pedestrian Tunnels at Aurora [pdf] 364 KB
2016 Widening of Dufferin Bridge - August 2016 [pdf] 226 KB
2016 Widening of Dufferin Bridge - September 2016 Update [pdf] 216 KB
2015 Notice of Public Meeting #1 (November 2015) [pdf] 218 KB
2015 Public Meeting #1 Story Boards [pdf] 1.59 MB

Back to top

Bowmanville Expansion

Date Document Name Type of Information File Size
2021 Topographic Survey Work - Winter 2021/2022 [pdf] 439 KB
2021 Geotechnical Investigative Work [pdf] 332 KB
2020 Investigative Work Begins [pdf] 181 KB
2019 Notice of Public Meeting [pdf] 2.03 MB
2019 Meeting Archive (Public Update Meeting May 21/22, 2019) [pdf] 1.1 MB
2010 Appendix A - Pre Notice of Commencement (January 2010) [pdf] 20 MB
2010 Appendix B - Notice of TPAP Study Commencement (September 29, 2010) [pdf] 23.7 MB
2010 Appendix C - Corbett Creek Watershed Flood Study (November 2010) [pdf] 356 KB
2010 Appendix C - Whitby Rail Maintenance Facility SWM (December 2010) [pdf] 617 KB
2010 Appendix D - Natural Environmental Conditions Report (September 30, 2010) [pdf] 13.9 MB
2011 Appendix E - Air Quality Assessment (January 2011) [pdf] 920 KB
2011 Appendix E - Human Health Risk Assessment - Report (January 2011) [pdf] 1.7 MB
2011 Appendix E - Human Health Risk Assessment - Appendices (January 2011) [pdf] 1.8 MB
2011 Appendix F - Noise and Vibration (January 14, 2011) [pdf] 9.2 MB
2010 Appendix G - Archaeology (October 2010) [pdf] 10.8 MB
2010 Appendix H - Plans and Profiles (August 6, 2010) [pdf] 5.8 MB
2011 Ministry of the Environment and Climate Change Notice to Proceed (March 28, 2011) [pdf] 161 KB

Back to top

Burloak Drive Grade Separation

Date Document Name Type of Information File Size
13/06/2022 Early Works for Burloak Drive Grade Separation Starting June/July 2022 [pdf] 284 KB

Back to top

Cooksville GO Station

Date Document Name Type of Information File Size
2018 Cooksville GO Station Redevelopment: Pedestrian Bridge Lift Completed [pdf] 147 KB
2018 Cooksville GO Station Redevelopment: Pedestrian Bridge Lift [pdf] 113 KB
2018 Cooksville GO Station Redevelopment: Fall Update [pdf] 2.13 MB
2018 Cooksville GO Station Redevelopment: Summer Update [pdf] 150 KB

Back to top

Davenport Diamond

Date Document Name Type of Information File Size
02/08/2022 South of Bloor Street W Bridge Ground Improvements - Night Work August 1 –12, 2022 [pdf] 355 KB
25/07/2022 Bloor Street W Ductbank and Chambers Install August 2 – September 30, 2022 [pdf] 250 KB
18/07/2022 Paton Rd Parking Restrictions from Wade Ave to Lansdowne Ave July 14 - September 2, 2022 [pdf] 319 KB
12/07/2022 MSE Leveling Pad and Panel Installation July 18 - July 20, 2022 [pdf] 277 KB
12/07/2022 Material Staging and Track Welding June 16 - July 21, 2022 [pdf] 293 KB
30/06/2022 Track Crossing Installation Within Rail Corridor July 4 - July 9, 2022 (5 nights) [pdf] 370 KB
28/06/2022 Davenport Diamond Guideway Construction Liaison Committee Meeting #25 [pdf] 4.79 MB
08/06/2022 Davenport Diamond Guideway Construction Liaison Committee Meeting #24 [pdf] 3.45 MB
07/06/2022 Davenport Diamond Guideway Construction Liaison Committee Meeting #23 [pdf] 3.55 MB
02/06/2022 Davenport Bridge Rehabilitation - Overnight Work June 3, 4, 5, 2022 (three nights) [pdf] 251 KB
06/05/2022 Wade Avenue to Paton Road Grading and Drainage Installation - Overnight Work May 11-12, 2022 (two nights) [pdf] 303 KB
27/04/2022 Paton Road & Wallace Avenue Street Parking Restrictions May 11-21, 2022 and May 29 to September 30, 2022 [pdf] 270 KB
12/04/2022 Davenport Diamond Guideway Construction Liaison Committee Meeting #22 [pdf] 4.21 MB
12/04/2022 Davenport Diamond Greenway Community Liaison Committee Meeting #4 [pdf] 9.44 MB
16/03/2022 Dupont Street Full Closures for Precast Girders Erection April 4 – April 17, 2022 (Overnight) [pdf] 151 KB
16/03/2022 Bloor Street West Full Closures for Girder Erection March 29 to April 2, 2022 (Overnight) [pdf] 251 KB
16/03/2022 Non-Destructive Testing March 14th, 2022 [pdf] 386 KB
28/02/2022 Davenport Diamond Guideway Construction Liaison Committee Meeting #21 [pdf] 4.56 MB
07/02/2022 Davenport Diamond Guideway Construction Liaison Committee Meeting #20 [pdf] 6.18 MB
31/01/2022 Wallace Avenue: Toronto Hydro Overhead Line Relocation for the Davenport Diamond Guideway [pdf] 231 KB
2021 Davenport Diamond Guideway Construction Liaison Committee Meeting #19 [pdf] 11.1 MB
2021 Antler Street: New Duct Bank Installation for Future Power Feed to the Davenport Diamond Guideway [pdf] 280 KB
2021 Bloor Street West: Temporary South Sidewalk Removal and Closure & North and South Bridge Abutment Construction [pdf] 312 KB
2021 Increased Construction Activity and Truck Traffic at 640 Lansdowne Avenue (at Paton Road) [pdf] 277 KB
2021 Hydro Pole and Overhead Hydro Relocation at Wallace Avenue Rail Crossing [pdf] 278 KB
2021 CP Bridge Girder Installation: Bolting and Tensioning at CP Diamond - Overnight Work [pdf] 303 KB
2021 Parking Restrictions on Paton Road and Wallace Avenue for Equipment and Material Deliveries [pdf] 448 KB
2021 CP Bridge Girder Delivery and Installation at CP Diamond - Overnight Work [pdf] 475 KB
2021 North MSE Wall Grading and Drainage Installation between CP Diamond and Davenport Road - Late Night Work [pdf] 442 KB
2021 Paton Road to Wallace Avenue Grading, Drainage Installation and Monitoring Well Relocation - Overnight Work [pdf] 419 KB
2021 Davenport Diamond Guideway Construction Liaison Committee Meeting #18 [pdf] 17.4 MB
2021 North MSE Wall Grading and Drainage Installation between CP Diamond and Davenport Road - Late Night Work [pdf] 419 KB
2021 Gantry Crane Footing Installation at Dupont Street - Overnight Work [pdf] 317 KB
2021 Bloor Street West: Temporary South Sidewalk Installation and North Bridge Abutment Demolition [pdf] 331 KB
2021 Track Crossing Installation near the CP Diamond - Overnight Work [pdf] 276 KB
2021 Davenport Diamond Guideway Construction Liaison Committee Meeting #17 [pdf] 16.6 MB
2021 Davenport Diamond Guideway Construction Liaison Committee Meeting #16 [pdf] 13.3 MB
2021 Davenport Diamond Greenway Community Liaison Committee Meeting #2 [pdf] 11.5 MB
2021 Bloor Street West: Temporary South Sidewalk Installation and North Bridge Abutment Demolition [pdf] 258 KB
2021 Temporary Relocation of Accessible Parking Spot on Paton Road for Equipment Removal [pdf] 415 KB
2021 Bloor Street West: Caisson Drilling North & South Sides of Bridge and Lane/Sidewalk Closures [pdf] 278 KB
2021 Shoring Wall Installation at Wallace Avenue Rail Crossing - Night Work [pdf] 416 KB
2021 Gantry Crane Footing Installation at Dupont Street - Overnight Work [pdf] 338 KB
2021 Gantry Crane Footing Installation at Wallace Avenue - Overnight Work [pdf] 319 KB
2021 Davenport Diamond Guideway Construction Liaison Committee Meeting #15 [pdf] 12.4 MB
2021 Power Cable Relocation between Dupont Street & the CP Diamond - Overnight Work [pdf] 342 KB
2021 Bloor Street West: Excavation Behind the North Bridge Abutment - Late Evening Work [pdf] 279 KB
2021 Davenport Diamond Greenway Community Liaison Committee Meeting #1 [pdf] 5.46 MB
2021 New Wallace Avenue Bridge South Abutment Work and Shoring Wall Installation [pdf] 419 KB
2021 Bloor Street West: Partial Road and Sidewalk Closure (South Side) for Bridge and Sidewalk Work [pdf] 280 KB
2021 Overnight Work - Load Transfer Platform North of CP Diamond [pdf] 403 KB
2021 Community Update: Early Start Time for Crews - 6 a.m. [pdf] 423 KB
2021 Late Night Work - Signal Cable and Pole Relocation at Wallace Avenue Rail Crossing [pdf] 276 KB
2021 Davenport Diamond Guideway Construction Liaison Committee Meeting #14 [pdf] 12.2 MB
2021 Short Term Sidewalk Closures on Bloor Street West for Scaffolding Installation [pdf] 455 KB
2021 Davenport Diamond Guideway Construction Liaison Committee Meeting #13 [pdf] 10.9 MB
2021 Paton Road Pedestrian Underpass Caisson Drilling [pdf] 427 KB
2021 Bloor Street West: Excavation Behind the North and South Bridge Abutments [pdf] 446 KB
2021 Bloor Street West: Partial Road and Sidewalk Closures for Bridge Work - South Side [pdf] 408 KB
2021 Community Update on Night and Weekend Work [pdf] 397 KB
2021 Davenport Diamond Guideway Construction Liaison Committee Meeting #12 [pdf] 9.97 MB
2021 Community Update on Evening/Night Work - Caisson Drilling (Dupont Street to Wallace Avenue) [pdf] 410 KB
2021 Bloor Street Bridge: Late Night Shoring Wall Construction - Drilling and Concrete Pouring [pdf] 398 KB
2021 Late Night (5 p.m. to 11 p.m.) Ground Improvement Work North of CP Diamond [pdf] 273 KB
2021 Bloor Street West Rail Bridge - Shoring & Excavation [pdf] 281 KB
2021 Ground Improvement & Shoring Wall Construction North of CP Diamond [pdf] 275 KB
2021 Rail Maintenance Work (Overnight) [pdf] 397 KB
2021 Caisson Drilling - Extended Work Hours (Day & Night) [pdf] 307 KB
2021 Construction Liaison Committee (CLC), March 2021 [pdf] 14.6 MB
2021 Construction Liaison Committee (CLC), February 2021 [pdf] 8.33 MB
2021 Construction Liaison Committee (CLC), January 2021 [pdf] 12.6 MB
2020 Project Backgrounder [pdf] 302 KB
2020 Public Open House Boards (March 2020) [pdf] 9.2 MB
2020 Davenport Diamond Guideway and Greenway FAQ [pdf] 632 KB
2020 Construction Liaison Committee (CLC), November 2020 [pdf] 15.4 MB
2020 Construction Liaison Committee (CLC), October 2020 [pdf] 4.9 MB
2020 Construction Liaison Committee (CLC), September 2020 [pdf] 5.4 MB
2020 Construction Liaison Committee (CLC), August 2020 [pdf] 4.5 MB
2020 Construction Liaison Committee (CLC), July 2020 [pdf] 6.1 MB
2020 Construction Liaison Committee (CLC), June 2020 [pdf] 5 MB
2020 Construction Liaison Committee (CLC), May 2020 [pdf] 4.6 MB
2020 Construction Liaison Committee (CLC), April 2020 [pdf] 6.4 MB
2020 Surfacing & Destressing, November 2020 [pdf] 414 KB
2020 Overnight Caisson Drilling, November 2020 [pdf] 423 KB
2020 Overnight Utility Daylighting, November 2020 [pdf] 405 KB
2020 Bloor Street West Closures for Bridge Demolition, November 2020 [pdf] 397 KB
2020 Bloor Street Bridge Columns Bracing, November 2020 [pdf] 363 KB
2020 Rail Repair (Overnight Work), November 2020 [pdf] 184 KB
2020 Caisson Drilling, November 2020 [pdf] 200 KB
2020 Hydrovacing & Daylighting, October 2020 [pdf] 195 KB
2020 Barrier and Fence Installations, October 2020 [pdf] 242 KB
2020 Campbell Park - Tree Pruning and Protection, September 2020 [pdf] 230 KB
2020 Surfacing & Hydrovacing, September 2020 [pdf] 201 KB
2020 Main Line Track Removal (Overnight Work), September 2020 [pdf] 212 KB
2020 Barrier Installation (Overnight Work), September 2020 [pdf] 224 KB
2020 Main Line Rail Replacement (Overnight Work), September 2020 [pdf] 155 KB
2020 Temporary Davenport Diamond Installation & Diversion Track Tie-In, September 2020 [pdf] 164 KB
2020 Campbell Park - Tree Pruning and Protection - Fact Sheet [pdf] 172 KB
2020 Campbell Park - Tree Pruning and Protection, September 2020 [pdf] 181 KB
2020 Temporary Davenport Diamond Installation & Diversion Track Tie-In, September 2020 [pdf] 200 KB
2020 Updated Track Surfacing, August 2020 [pdf] 175 KB
2020 Temporary Davenport Diamond Installation & Diversion Track Tie-In August 2020 [pdf] 170 KB
2020 Updated Track Surfacing, July 2020 [pdf] 251 KB
2020 Updated Wallace Avenue Signal Relocation, Watermain Protection and Track Panel Installation, July 2020 [pdf] 151 KB
2020 Wallace Avenue Signal Relocations - Updated, June 2020 [pdf] 169 KB
2020 Shoring Wall Notice, June 2020 [pdf] 115 KB
2020 Notice for Site Access Construction, May 2020 [pdf] 216 KB
2020 Updated Tree Removal Notice, May 2020 [pdf] 167 KB
2020 Tree Removal, March 2020 [pdf] 268 KB
2020 Update: Utility Testing, February 2020 [pdf] 319 KB
2020 Geotechnical Studies, January 2020 [pdf] 191 KB
2019 Public Open House Boards (November 2019) [pdf] 8.8 MB
2019 Update: Utility Testing, November 2019 [pdf] 196 KB
2019 Utility Testing, October 2019 [pdf] 267 KB
2019 Geotechnical Studies, October 2019 [pdf] 356 KB
2019 Enabling Works Notice, February 2019 [pdf] 256 KB
2016 Davenport Diamond Grade Separation Transit Project Assessment Process Environmental Project Report May 2016 Volume 1 Report [pdf] 15.4 MB

Back to top

Durham-Scarborough Bus Rapid Transit

Date Document Name Type of Information File Size
2021 Bus Rapid Transit to Support Your Growing Community [pdf] 406 KB

Back to top

Eglinton Crosstown West Extension

Date Document Name Type of Information File Size
19/07/2022 Work in the Kipling and Islington area in July 2022 [pdf] 315 KB
29/06/2022 Construction Continues at Kipling Intersection [pdf] 151 KB
29/06/2022 Site Office at Richview Road [pdf] 251 KB
20/05/2022 Groundwater and Surface Water Sampling along Eglinton Ave. West from Scarlett Road to Emmett Ave. [pdf] 233 KB
21/04/2022 Road realignment at Scarlett Road and Eglinton Ave. West beginning in April 2022 [pdf] 621 KB
21/04/2022 Tunnelling begins at the launch shaft site at Renforth Drive and Eglinton Avenue West [pdf] 270 KB
07/04/2022 Subsurface Utilities Engineering work at Scarlett Road and Eglinton Avenue West [pdf] 246 KB
01/04/2022 Drilling and Water Sampling at Scarlett Road and Eglinton Ave. West [pdf] 525 KB
28/03/2022 Work in the Martin Grove and Kipling area beginning April 2022 [pdf] 361 KB
24/03/2022 Groundwater Assessments along Eglinton Ave. West (Renforth Drive to Weston Road) [pdf] 268 KB
18/03/2022 Subsurface Utilities Engineering work at Jane Street and Eglinton Avenue West [pdf] 562 KB
17/03/2022 Subsurface Utilities Engineering work at Hwy 427 near Eglinton Ave West and The East Mall [pdf] 333 KB
03/03/2022 Drilling and Water Sampling at Scarlett Road and Eglinton Ave. West [pdf] 357 KB
12/01/2022 Work in the Scarlett Road and Eglinton Ave. West area beginning in January 2022 (updated) [pdf] 796 KB
2021 Overnight work at the launch shaft site at Renforth Drive and Eglinton Avenue West [pdf] 419 KB
2021 Work in the Scarlett Road/Eglinton Ave. West area beginning in November [pdf] 377 KB
2021 Environmental fieldwork along Eglinton Ave West between Martin Grove Road and Weston Road [pdf] 272 KB
2021 Archaeological investigations along Eglinton Ave West between Martin Grove Road and Weston Road [pdf] 406 KB
2021 Investigative drilling along Humber Valley on the North Side of Eglinton Ave West and Fergy Brown Park [pdf] 266 KB
2021 Work on the Launch Shaft Site Begins at Renforth Drive and Eglinton Avenue West [pdf] 356 KB
2021 Utility relocation and investigative drilling work between Martin Grove Rd. and Scarlett Rd. [pdf] 323 KB
2021 Investigative drilling work at Renforth Drive and Eglinton Avenue West [pdf] 992 KB
2021 Investigative drilling work between Scarlett Road and east of Weston Road [pdf] 697 KB
2020 Notice of EPR Addendum [pdf] 435 KB
2020 Tree Removal for the Tunnel Boring Machine Launch Site [pdf] 219 KB
2020 Drilling work on Eglinton Avenue West between Jane Street and Weston Road [pdf] 427 KB
2020 Drilling work on Eglinton Avenue West between Martin Grove Road and Jane Street [pdf] 241 KB

Back to top

Eglinton GO Station

Date Document Name Type of Information File Size
2021 Eglinton GO Accessibility Upgrades [pdf] 9.53 MB

Back to top

Electrification

Date Document Name Type of Information File Size
2017 Notice to Proceed [pdf] 263 KB
2017 Statement of Completion [pdf] 3.4 MB
2017 Notice of Completion [pdf] 370 KB
2017 GO Rail Network Electrification TPAP Notice of Commencement [pdf] 347 KB
2017 Public Meeting #3 Agenda/Feedback Form [pdf] 51 KB
2017 Presentation [pdf] 1.6 MB
2017 Integrated Feedback Summary Report [pdf] 1.1 MB
2017 Story Boards [pdf] 1.4 MB
2017 Electrification EA Update [pdf] 237 KB
2016 Public Meeting #1 Presentation [pdf] 13.8 MB
2016 Meeting Summary Report [pdf] 128.6 MB
2016 Public Meeting #2 Public Meeting Notice [pdf] 240 KB
2016 Integrated Feedback Summary Report [pdf] 1.1 MB

Back to top

Finch West LRT

Date Document Name Type of Information File Size
08/08/2022 Wet utilities Installation on Finch Avenue West and Milvan Drive August 8, 2022 – September 7, 2022 [pdf] 309 KB
08/08/2022 Road closure for wet utilities installation. Finch Avenue West at Kendleton Drive. August 15-19, 2022 [pdf] 310 KB
08/08/2022 Road closure for wet utilities installation. Finch Avenue West at Milady Road. August 8-11, 2022 [pdf] 318 KB
08/08/2022 Wet utilities work at the intersection of Finch Avenue West and Pelican Gate July 28-29, 2022 [pdf] 364 KB
03/08/2022 Road closure for wet utilities installation - Finch Avenue West at John Garland Boulevard. August 4-8, 2022 [pdf] 469 KB
03/08/2022 Road closure for wet utilities installation at Finch Avenue West and Silverstone Drive. August 2-4, 2022 [pdf] 332 KB
21/07/2022 Guideway installation on Finch Avenue West and Duncanwoods Road November 28, 2022 - January 2023 [pdf] 487 KB
21/07/2022 Guideway installation on Finch Avenue West and Jayzel Drive September 26 - November 2022 [pdf] 426 KB
21/07/2022 Guideway installation on Finch Avenue West and Pearldale Avenue September 19 - November 2022 [pdf] 442 KB
21/07/2022 Guideway installation on Finch Avenue West and Romfield Lane (West Side) July 25 - October, 2022 [pdf] 469 KB
08/07/2022 Temporary Traffic changes at the Intersection of Tobermory Drive and Finch Avenue West July 4-15, 2022 [pdf] 335 KB
08/07/2022 Wet utilities Installation on Finch Avenue West and Rumike Road. July 4-8, 2022 [pdf] 314 KB
13/06/2022 Wet utilities Installation on Finch Avenue West and Milvan Drive, July 11 – August 12 2022 [pdf] 341 KB
13/06/2022 Wet utilities Installation on Finch Avenue West and Pittsboro Drive, June 9-17, 2022 [pdf] 339 KB
13/06/2022 Traffic Changes for Finch/Westmore Area, June 15– August 2022 [pdf] 271 KB
08/06/2022 Light Rail Vehicle Testing and Safety [pdf] 1.9 MB
02/06/2022 Highway 400 Ramp Closure to facilitate Multiuse Path Tunnel Installation Work June 9 - 13, 2022 [pdf] 348 KB
02/06/2022 Update: Wet utilities Installation on Finch Avenue West and Rumike Road May 30, 2022 – June 6, 2022 [pdf] 316 KB
02/06/2022 Traffic Changes for Finch/Keele Area May 2022 – December 2022 [pdf] 315 KB
18/05/2022 Wet utilities Installation on Finch Avenue West and Rumike Road. May 18, 2022– May 25, 2022 [pdf] 360 KB
09/05/2022 Wet utilities installation on Finch Avenue West and Milvan Drive. May 9, 2022 – May 27, 2022 [pdf] 511 KB
05/05/2022 Finch West LRT Project Construction Liaison Committee (CLC) - Tuesday, May 3, 2022 [pdf] 5.01 MB
19/04/2022 Community Update Q2 - Works on Finch Avenue West, between Driftwood and Keele - April 2022 - June 2022 [pdf] 592 KB
19/04/2022 Community Update Q2 - Works on Finch Avenue West, between Humber College to Westmore - April 2022 - June 2022 [pdf] 499 KB
19/04/2022 Community Update Q2 - Works on Finch Avenue West, between Islington to Weston - April 2022 - June 2022 [pdf] 755 KB
19/04/2022 Community Update Q2 - Works on Finch Avenue West, between Weston to Driftwood - April 2022 - June 2022 [pdf] 530 KB
19/04/2022 Community Update Q2 - Works on Finch Avenue West, between Westmore to Islington - April 2022 - June 2022 [pdf] 479 KB
05/04/2022 Guideway installation on Finch Avenue West and Highway 400, southbound off ramp - April 8, 2022 - September 2022 [pdf] 390 KB
05/04/2022 Guideway installation on Finch Avenue West and Highway 400, northbound off-ramp - April 4, 2022 - June 2022 [pdf] 325 KB
05/04/2022 Wet utilities Installation on Finch Avenue West and Rumike Road, end of April 2022 – mid-May 2022 [pdf] 345 KB
31/03/2022 Wet utilities Installation on Finch Avenue West and Milady Road, June 2022 – July 2022 [pdf] 478 KB
30/03/2022 Guideway installation on Finch Avenue West and Signet Drive, July - September 2022 [pdf] 151 KB
30/03/2022 Wet utilities Installation on Finch Avenue West and Milvan Drive, April 11, 2022 – May 2, 2022 [pdf] 251 KB
30/03/2022 Road work on Finch Avenue West and Islington Avenue, April 6, 2022 – June 16, 2022 [pdf] 455 KB
24/03/2022 North Sidewalk Closure at Finch Avenue West and Weston Road March 16 – end of April, 2022 [pdf] 344 KB
22/03/2022 Road closure for guideway installation on Finch Avenue West and Damascus Road March 22, 2022 – end of May, 2022 [pdf] 264 KB
22/03/2022 Guideway installation on Finch Avenue West and Martin Grove Road mid-April to August, 2022 [pdf] 520 KB
17/03/2022 Retaining wall installation on Finch Avenue West between Weston Road and Signet Drive mid-August 2022 – October 2022 [pdf] 427 KB
17/03/2022 Partial Road Closure for Overhead String adjustments Finch Avenue West at Yorkgate Boulevard March 21-April 4, 2022 [pdf] 338 KB
09/03/2022 Partial Road Closure for Overhead String adjustments Finch Avenue West at Yorkgate Boulevard March 14-March 28, 2022 [pdf] 475 KB
04/03/2022 Guideway installation on Finch Avenue West and Sentinel Road, April 1 2022 – July 2022 [pdf] 442 KB
03/03/2022 Overhead and underground electrical work along Finch Avenue West corridor July 2022- September 2022 [pdf] 347 KB
03/03/2022 Overhead and underground electrical work along Finch Avenue West corridor May 2022- November 2022 [pdf] 356 KB
03/03/2022 Overhead and underground electrical work along Finch Avenue West corridor April 2022- September 2022 [pdf] 349 KB
03/03/2022 Overhead and underground electrical work along Finch Avenue West corridor March 2022- August 2022 [pdf] 363 KB
23/02/2022 Community Update Q1 - Works on Finch Avenue West, between Driftwood Avenue and Keele Street February 2022 - March 2022 [pdf] 3.13 MB
23/02/2022 Community Update Q1 - Works on Highway 27 and Finch Avenue West, from Humber College Boulevard to Westmore Drive February 2022 - April 2022 [pdf] 2.8 MB
23/02/2022 Community Update Q1 - Works on Finch Avenue West, between Islington Avenue and Weston Road February 2022 - March 2022 [pdf] 3.79 MB
23/02/2022 Community Update Q1 - Works on Finch Avenue West, between Islington Avenue and Westmore Drive February 2022 - April 2022 [pdf] 2.15 MB
23/02/2022 Community Update Q1 - Works on Finch Avenue West, between Weston Road and Driftwood Avenue February 2022 - April 2022 [pdf] 3.72 MB
14/02/2022 Guideway installation on Finch Avenue West between Albion Road and Martin Grove Road [pdf] 358 KB
10/02/2022 Partial Road Closure for Utilities Installation on Finch Avenue West and Albion Road [pdf] 488 KB
10/02/2022 Partial Road Closure for Utilities Installation at Finch Avenue West and Pittsboro Drive [pdf] 323 KB
07/02/2022 Road closure at Ardwick Boulevard and Finch Avenue West [pdf] 370 KB
27/01/2022 Temporary Lane Closures at Finch Avenue West and Sentinel Road [pdf] 538 KB
25/01/2022 Partial Road Closure for Overhead String adjustments at Finch Avenue West and Yorkgate Boulevard [pdf] 468 KB
19/01/2022 Road Closures for Guideway Installation Finch Avenue West at Damascus Drive and Silverstone Drive [pdf] 445 KB
17/01/2022 Road work on Finch Avenue West at Tobermory Drive [pdf] 408 KB
14/01/2022 Humber River Bridge Rehabilitation Finch Avenue West and Islington Avenue [pdf] 436 KB
14/01/2022 Guideway installation on Finch Avenue West between Albion Road and Martin Grove Road [pdf] 342 KB
12/01/2022 Traffic split at Finch Avenue West and Romfield Lane [pdf] 1.33 MB
11/01/2022 Road closure at Duncanwoods Drive and Finch Avenue West [pdf] 444 KB
2021 Intersection Closure at Albion Road and Finch Avenue West [pdf] 217 KB
2021 Storm mainline installation at Duncanwoods Avenue and Finch Avenue West [pdf] 318 KB
2021 Sidewalk closure at Albion Road and Finch Avenue West [pdf] 355 KB
2021 Road Work between Martin Grove Road and John Garland Boulevard [pdf] 438 KB
2021 Community Benefits Year End Report - 2020 [pdf] 9.53 MB
2020 Overnight Utility Work, posted August 6, 2020 [pdf] 526 KB
2020 Temporary Traffic Signal Installation Albion Rd., Martin Grove and Albion Mall Driveway, posted August 4, 2020 [pdf] 278 KB
2020 New Traffic Configuration for Utility Work York Gate Blvd. and Finch Ave. W. Stage 2, posted August 4, 2020 [pdf] 389 KB
2020 Sidewalk Closure Damascus Dr. to Silverstone Dr., posted August 4, 2020 [pdf] 329 KB
2020 Traffic Changes for Drilling Activity, posted July 28, 2020 [pdf] 626 KB
2020 Overnight Utility Work Hwy 400 Ramp Closures, posted July 28, 2020 [pdf] 337 KB
2020 Temporary Traffic Signal Installation Finch Ave. W. and Silverstone Dr. and Norfinch Dr./Oakdale Rd., posted July 23, 2020 [pdf] 436 KB
2020 Sidewalk Closure at Norfinch Dr., posted July 22, 2020 [pdf] 840 KB
2020 Sidewalk Closure for Telecom Work From Tobermory Dr. to Black Creek Crosswalk Extended until end of July 2020, posted July 17, 2020 [pdf] 631 KB
2020 New Traffic Configuration for Utility Work York Gate Blvd. and Finch Ave. W. July-August 2020, posted July 17, 2020 [pdf] 270 KB
2020 Sidewalk Closure for Telecom Work From Arrow Rd. to Oakdale Rd. Extended until late-July 2020, posted July 17, 2020 [pdf] 1 MB
2020 Sidewalk Closure for Telecom Work From Westmore Dr. to Silverstone Dr. July 2020 for 2 weeks, posted July 14, 2020 [pdf] 307 KB
2020 Road Widening and Utility Work Along East of Hwy. 27 from South of Humber College Blvd. to Finch Ave. W. Late-July 2020, posted July 14, 2020 [pdf] 843 KB
2020 New Traffic Configuration for Utility Work York Gate Blvd. and Finch Ave. W., posted July 8, 2020 [pdf] 631 KB
2020 New Traffic Configuration During Watermain and Storm Sewer Installation, posted June 26, 2020 [pdf] 668 KB
2020 Sidewalk Closure for Telecom Work From Arrow Rd. to Oakdale Rd., posted June 22, 2020 [pdf] 265 KB
2020 Sidewalk Closure for Telecom Work From Tobermory Dr. to Black Creek Crosswalk Mid-June 2020 for 3 weeks, posted June 16, 2020 [pdf] 311 KB
2020 Driveway Access Restrictions James Cardinal McGuigan Catholic High School, posted June 16, 2020 [pdf] 301 KB
2020 Lane Reduction for Road Widening Along Finch Ave. W. from east of Tobermory Dr. to Jane St. Mid-June until late September 2020, posted June 12, 2020 [pdf] 680 KB
2020 Installation of Temporary Traffic Signals York Gate Blvd. and Finch Ave. W., posted June 12, 2020 [pdf] 140 KB
2020 Sidewalk Closure for Telecom Work From Driftwood Ave. to Topcliff Ave. Rd., posted June 11, 2020 [pdf] 354 KB
2020 Overhead and Underground Electrical Work From San Romanoway to Sentinel Rd., posted June 11, 2020 [pdf] 253 KB
2020 Overhead and Underground Electrical Work From Sentinel Road to Tangiers Road, posted June 11, 2020 [pdf] 206 KB
2020 Watermain Installation at Finch Ave W and Hwy 27 Area Ongoing until mid-June 2020, posted June 10, 2020 [pdf] 527 KB
2020 Utility Work Highway 27 at Finch Ave. W. July 2020, posted June 10, 2020 [pdf] 377 KB
2020 Lane Closure at Finch Ave W at Hwy 27 May 18 - to mid-July, posted June 10, 2020 [pdf] 141 KB
2020 Installation of Temporary Traffic Signals Driftwood Ave. and Finch Ave. W., posted June 1, 2020 [pdf] 139 KB
2020 Installing Piles for the new Finch West Station - Finch Ave. W. from Romfield Ln. to Keele St., June 1, 2020 [pdf] 213 KB
2020 Road Widening Along Hwy. 27 from Humber River to north of Finch Ave. W., posted May 27, 2020 [pdf] 659 KB
2020 Underground Civil Work From Signet Dr. to San Romanoway, posted May 25, 2020 [pdf] 273 KB
2020 Bus Stops Closed/Relocated Finch Ave. W. and Humber College Blvd., posted May 25, 2020 [pdf] 357 KB
2020 Telecom Work from Hwy. 27 to Damascus Dr. /Kiskadee Dr., posted May 20, 2020 [pdf] 351 KB
2020 Extended: Sidewalk Closure on the West Side of York Gate Blvd. at Finch Ave. W., posted May 20, 2020 [pdf] 256 KB
2020 Humber College Station Site Upcoming Works, posted April 14, 2020 [pdf] 293 KB
2020 Utility Work from Signet Drive/Arrow Road to San Romanoway, posted April 9, 2020 [pdf] 271 KB
2020 Road Widening, Watermain and Storm Sewer Installation Finch Ave. W. from Tobermory Dr. to Tangiers Rd., posted March 26, 2020 [pdf] 304 KB
2020 Installing Piles for the new Finch West Station Finch Ave. W. from Romfield Ln. to Keele St., posted March 23, 2020 [pdf] 392 KB
2020 Traffic Disruptions on Finch Ave. W. from Romfield Ln. to Tangiers Rd., posted February 12, 2020 [pdf] 107 KB
2020 Installing Supports for the new Finch West Station at Finch Ave W and Keele St, posted January 29, 2020 [pdf] 321 KB
2020 Partial lane reductions on the northbound and southbound on-ramps to Hwy 400, posted January 14, 2020 [pdf] 294 KB
2020 Extended Temporary Changes to Traffic Access to Elana Dr. from Finch Ave. W., June 2020 [pdf] 227 KB
2019 Tree Removal on Finch West and HWY 27, September 2019 [pdf] 270 KB
2019 Humber College Parking Lot #5 and Adjacent Pathways Closed Expected Timeline: End of May 2019 [pdf] 239 KB
2019 Update: Street Furniture Removals along Finch Ave. W., from Tobermory Dr.to Tangiers Rd., October 2019 [pdf] 253 KB
2019 Update: Installation of a Temporary Steel Plate to Cover Excavation and Relocation of Hydro Poles, from Romfield Ln. to Keele St., October 2019 [pdf] 467 KB
2019 Update: Lane Closures for Watermain and Storm Sewer Works along Finch Ave. W., from east of Tobermory Dr. to Romfield Ln., October 8 2019 [pdf] 237 KB
2019 Update: Lane Closures for Watermain and Storm Sewer Works along Finch Ave. W., from east of Tobermory Dr. to Romfield Ln., October 2 2019 [pdf] 625 KB
2019 Update: Median Removals on Finch Ave. W., east of Tobermory Dr., and on Sentinel Rd., north of Finch Ave. W., October 2019 [pdf] 173 KB
2019 Update: Temporary Traffic Signal Installation Tobermory Dr and Keele St., October 2019 [pdf] 173 KB
2019 Update: Updated Traffic Alert: Partial lane reductions on the northbound and southbound on-ramps to Highway 400, September 2019 [pdf] 246 KB
2019 Update: Median Removals on Finch Ave W, east of Tobermory Dr, and on Sentinel Rd, north of Finch Ave W, September 2019 [pdf] 245 KB
2019 Update: Sidewalk Closure on the West Side of York Gate Blvd. at Finch Ave. W. August 19, 2019 - May 1, 2020 [pdf] 240 KB
2019 Update: Tree Removal on Finch West and HWY 27, August 2019 [pdf] 190 KB
2019 Update: Traffic Alert: Partial lane reductions on the northbound and southbound on-ramps to Highway 400, August 2019 [pdf] 252 KB
2019 Update: Overnight Power Outage at Humber College, August 2019 [pdf] 165 KB
2019 Update: On-ramps to Highway 400 from Finch Avenue West to be Closed Overnight, August 2019 [pdf] 291 KB
2019 Update: Sidewalk closure: Intermittent sidewalk closure on the west side of York Gate Boulevard at Finch Avenue West, July 2019 [pdf] 310 KB
2019 Update: Traffic Alert: On-ramp to Highway 400 Southbound from Eastbound Finch Avenue West to be Closed Overnight (June 25 to 29), June 2019 [pdf] 104 KB
2019 Update: Expect Temporary Changes to Traffic Access to Elana Drive from Finch Avenue West, June 2019 [pdf] 752 KB
2019 Update: Overnight Noise and Vibration Notice, June 2019 [pdf] 160 KB
2019 Update: Short-term Lane Closures NB and SB on Highway 400 over Finch Avenue West, May 2019 [pdf] 186 KB
2019 Update: Pipeline Replacement for the Finch West Light Rail Transit (LRT), March 2019 [pdf] 224 KB
2019 Update: Overnight Lane Reduction Coming to On/Off-Ramps at Hwy. 400 Bridge & Finch Ave. West, Information as of February 2019 [pdf] 147 KB
2019 Update: Short-term Lane Closures on Finch Avenue West Near Highway 400 Bridge, February 2019 [pdf] 210 KB
2019 Update: Pipeline Replacement for the Finch West Light Rail Transit (LRT), January 2019 [pdf] 225 KB
2018 Update: Oil Pipeline work for the Finch West LRT Starting Early September, December 2018 [pdf] 142 KB
2018 Update: Short-term Lane Closures along Finch Ave.W. from Signet Dr. to Keele St. September 24 until April 2019, November 2018 [pdf] 241 KB
2018 Update: Gas Line Relocation for Finch West Light Rail Transit, Weston Rd. and Toryork Dr., November 2018 [pdf] 430 KB
2018 Update: Pipeline Replacement for the Finch West Light Rail Transit (LRT), October 2018 [pdf] 110 KB
2018 Update: Lindy Lou Park Access Trail from Finch Ave. is extended until the end of November 2018, September 2018 [pdf] 109 KB
2018 Update: Gas Line Relocation for Finch West Light Rail Transit, September 2018 [pdf] 130 KB
2018 Update: Pipeline Replacement for the Finch West Light Rail Transit (LRT), September 2018 [pdf] 159 KB
2018 Update: CLOSURE: Lindy Lou Park Access Trail from Finch Ave. July 23 to end of August 2018, July 2018 [pdf] 97 KB
2018 Update: Natural Gas Line Relocation for the Finch West Light Rail Transit (LRT) Finch Ave. West and Jayzel Dr. Closure, June 2018 [pdf] 254 KB
2018 Update: Natural Gas Line Relocation for the Finch West Light Rail Transit (LRT) Finch Ave. and Rumike Rd. Closure, May 2018 [pdf] 116 KB
2018 Update: Natural Gas Line Relocation for the Finch West Light Rail Transit (LRT), May 2018 [pdf] 262 KB
2018 Update: Finch West Closed from 7 p.m. on May 18th to 11 p.m. on May 25th, May 2018 [pdf] 214 KB
2018 Update: Finch Access Closure to Humber River Recreational Trail, March 2018 [pdf] 180 KB
2018 Update: Gas Line Relocation for Finch West Light Rail Transit, March 2018 [pdf] 217 KB
2017 Update: Finch Avenue West between Milvan Drive and Weston Road, November 2017 [pdf] 249 KB
2017 Update: Finch Avenue West at Signet Drive/Arrow Road, October 2017 [pdf] 249 KB
2017 Update: Islington & Finch, September 2017 [pdf] 285 KB
2017 Update: Finch Avenue West between Kipling & Islington, July 2017 [pdf] 319 KB
2017 Update: Islington & Finch, May 2017 [pdf] 266 KB
2017 Update: Driftwood & Finch, April 2017 [pdf] 299 KB
2017 Update: Kipling & Finch, March 2017 [pdf] 355 KB
2017 Update: Sentinel & Finch, January 2017 [pdf] 229 KB
2017 Update: Martin Grove & Finch, January 2017 [pdf] 343 KB
2018 Apprenticeship Plan [pdf] 242 KB
2019 Community Benefits Year End Report 2019 [pdf] 1.4 MB
2018 Community Benefits and Liaison Plan [pdf] 339 KB
2019 Community Benefits and Liaison Plan January 1 June 30, 2019 [pdf] 1.7 MB
2019 Community Benefits and Liaison Plan July 1 September 30, 2019 [pdf] 1.2 MB
2019 Finch West LRT Community Benefits Postcard [pdf] 130 KB
2019 Alternative Financing and Procurement (AFP) [pdf] 67 KB
2010 Environmental Assessment Table of Contents and Cover Page [pdf] 100 KB
2010 Environmental Assessment Executive Summary [pdf] 297 KB
2015 Environmental Assessment Main Report [pdf] 13.7 MB
2015 Environmental Project Report [pdf] 37.7 MB
2015 Chapter 1 [pdf] 1.2 MB
2015 Chapter 2 [pdf] 3 MB
2015 Chapter 2 - Plates Part 1 [pdf] 3.9 MB
2015 Chapter 2 - Plates Part 2 [pdf] 3.1 MB
2015 Chapter 3 [pdf] 1.1 MB
2015 Chapter 4 [pdf] 1.3 MB
2015 Chapter 5 [pdf] 46 KB
2015 Chapter 6 [pdf] 34 KB
2015 Chapter 7 [pdf] 419 KB
2015 Chapter 8 [pdf] 28 KB
2015 Appendix A - Part 1 [pdf] 4.6 MB
2010 Appendix A - Part 2 [pdf] 3.3 MB
2010 Appendix A - Part 3 [pdf] 4 MB
2010 Appendix A - Part 4 [pdf] 3.9 MB
2010 Appendix C [pdf] 1.7 MB
2010 Appendix D [pdf] 2 MB
2010 Appendix E [pdf] 872 KB
2010 Appendix F [pdf] 4 MB
2010 Appendix G [pdf] 4.2 MB
2010 Appendix H [pdf] 3.9 MB
2010 Appendix I [pdf] 1.3 MB
2010 Appendix J [pdf] 2.4 MB
2010 Appendix K [pdf] 733 KB
2010 Appendix L [pdf] 3.1 MB
2010 Appendix M - Part 1 [pdf] 5 MB
2010 Appendix M - Part 2 [pdf] 4 MB
2010 Appendix M - Part 3 [pdf] 4 MB

Back to top

Hamilton LRT

Date Document Name Type of Information File Size
2017 Hamilton LRT 2017 EPR Addendum - Proponent Letter [pdf] 251 KB
2017 Hamilton LRT 2017 EPR Addendum - Minister’s Notice to Allow a Change [pdf] 151 KB
2017 Notice of EPR Addendum [pdf] 176 KB
2017 Main EPR document - amended [pdf] 14.2 MB
2017 Design drawings/maps [pdf] 37.3 MB
2017 Full EPR Addendum [webpage]

Back to top

Hurontario LRT

Date Document Name Type of Information File Size
2022 Overnight work on Hurontario Street between Armdale Road and Andrika Court, June 2022 [pdf] 404 KB
2022 Tree Protections, Trimming and Removal on Hurontario Street from Derrycrest Drive to Bartley Bull Parkway, May 2022 [pdf] 403 KB
2022 Overnight work on Hurontario Street between The Queensway and Dundas Street, May 2022 [pdf] 403 KB
2022 Guideway Construction on Hurontario Street from Matheson Boulevard to Britannia Road, March 2022 [pdf] 293 KB
2022 Overnight work on Hurontario Street between The Queensway and Dundas Street, March 2022 [pdf] 647 KB
2022 Overnight work on Hurontario Street between The Queensway and Dundas Street, February 2022 [pdf] 307 KB
2022 Utility Relocation and Road Widening on Hurontario Street from Bartley Bull Parkway to South of Highway 407, January 2022 [pdf] 171 KB
2021 Nighttime Work on the Lakeshore West Rail Corridor at Port Credit Station, December 2021 [pdf] 272 KB
2021 Utility Relocations Between Queensway and Paisley Boulevard on Hurontario Street, September 2021 [pdf] 176 KB
2021 Utility Relocation on Rathburn Road from Hurontario Street to Duke of York Boulevard, August 2021 [pdf] 310 KB
2021 Tree Protections, Trimming and Removal on Hurontario Street from Park Street to Matheson Boulevard, August 2021 [pdf] 312 KB
2021 Temporary Overnight Road Closure of Hurontario Street Between Mineola Road and Inglewood Drive, July 2021 [pdf] 414 KB
2021 Temporary Traffic Restrictions at Topflight Drive and Edwards Boulevard, July 2021 [pdf] 304 KB
2021 Utility Relocation and Road Widening on Hurontario Street from Matthews Gate to Eglinton Avenue and on Rathburn Road, July 2021 [pdf] 263 KB
2021 Utility Relocation and Road Widening on Hurontario Street from Pinetree Way to Matthews Gate, June 2021 [pdf] 327 KB
2021 New Traffic Configuration and Temporary Road Closure: Eaglewood Boulevard at Hurontario Street, June 2021 [pdf] 353 KB
2021 Utility Relocation and Road Widening on Hurontario Street from Matheson Boulevard to Highway 407, June 2021 [pdf] 609 KB
2021 Enbridge Gas Line Relocation on The Queensway and Hurontario Street, April 2021 [pdf] 329 KB
2021 Structural Work in the North and South Parking Lots at Port Credit GO Station, March 2021 [pdf] 141 KB
2021 Utility Relocation and Road Widening on Hurontario Street from Lakeshore Road East to Pinetree Way, January 2021 [pdf] 173 KB
2020 Enbridge Utility Relocation on Hurontario from Lancashire Lane to Steeles Avenue, September 2020 [pdf] 410 KB
2020 Utility Relocation on Hurontario from Matheson Boulevard to Highway 407, September 2020 [pdf] 608 KB
2020 Median Removals on Hurontario Street from Derrycrest Drive to Bartley Bull Parkway, August 2020 [pdf] 348 KB
2020 Median Removals on Hurontario Street between Dundas Street and Matheson Boulevard, May 2020 [pdf] 299 KB
2020 Enbridge Gas Line Relocation on Hurontario Street from Hampshire Crescent to Inglewood Drive, April 2020 [pdf] 204 KB
2020 Median Removals on Hurontario Street from Matheson Boulevard to Highway 407, March 2020 [pdf] 232 KB
2020 Enbridge Gas Line Relocation Hurontario Street from Highway 407 to Sir Lou Drive, February 2020 [pdf] 203 KB
2020 Subsurface Engineering, Boreholes and Survey Investigation on Hurontario Street, February 2020 [pdf] 201 KB
2020 Enbridge Gas Line Relocation Hurontario Street between Agnes Street and John Street, January 2020 [pdf] 215 KB
2020 Enbridge Gas Line Relocation Hurontario Street at Britannia Road, January 2020 [pdf] 188 KB
2020 Enbridge Gas Line Installation on Hurontario Street from Dundas Street East to Floradale Drive, January 2020 [pdf] 210 KB
2019 Enbridge Gas Line Relocation on Hurontario Street between Admiral Boulevard and Superior Boulevard, November 2019 [pdf] 197 KB
2019 Enbridge Gas Line Relocation on Hurontario Street at John Street West, November 2019 [pdf] 259 KB
2019 Enbridge Gas Line Relocation Hurontario Street from The Queensway to North Service Road, November 2019 [pdf] 343 KB
2019 Enbridge Gas Line Relocation Hurontario Street at Topflight Drive, November 2019 [pdf] 242 KB
2019 Enbridge Gas Line Relocation on Rathburn Road West from Station Gate Road to City Centre Drive, September 2019 [pdf] 182 KB
2019 Enbridge Gas Line Relocation Hurontario Street and Andrika Court, June 2019 [pdf] 194 KB
2019 Enbridge Gas Line Relocation Hurontario Street from Matthews Gate to Fairview Road, June 2019 [pdf] 203 KB
2019 UPDATED - Network Infrastructure Relocation, May 2019 [pdf] 236 KB
2019 Bell: Telecom Network Relocation, May 2019 [pdf] 142 KB
2019 Bell Network Infrastructure Relocation, March 2019 [pdf] 158 KB
2019 Enbridge Gas Distribution Line Relocation Hurontario Street from Floradale Drive to Paisley Boulevard, March 2019 [pdf] 202 KB
2019 Enbridge Gas Distribution Line Relocation Hurontario Street and Oriole Ave, March 2019 [pdf] 173 KB
2019 Enbridge Gas Distribution Line Relocation Hurontario Street and Eglinton Avenue, February 2019 [pdf] 349 KB
2019 Enbridge Gas Distribution Line Relocation Hurontario Street from Paisley Boulevard to the Queensway, January 2019 [pdf] 385 KB
2018 Enbridge Gas Distribution Line Relocation Hurontario Street from Elia Avenue to Eglinton Street, December 2018 [pdf] 335 KB
2018 Bell Network Infrastructure Relocation for Port Credit (Phase 2), November 2018 [pdf] 328 KB
2018 Enbridge Gas Distribution Line Relocation for Shepard Avenue, November 2018 [pdf] 322 KB
2018 Enbridge Gas Distribution Line Relocation Hurontario Street from John Street to Dundas Street, October 2018 [pdf] 395 KB
2018 Enbridge Gas Distribution Line Relocation for Centre View, October 2018 [pdf] 378 KB
2018 Enbridge Gas Distribution Line Relocation for City Centre Drive, August 2018 [pdf] 268 KB
2018 Bell Network Infrastructure Relocation, August 2018 [pdf] 278 KB
2018 Enbridge Gas Distribution Line Relocation for Elia Avenue, August 2018 [pdf] 246 KB
2018 Telecom Network Relocation, July 2018 [pdf] 283 KB
2018 Enbridge Gas Distribution Line Relocation for Bristol Road, July 2018 [pdf] 317 KB
2018 Enbridge Gas Distribution Line Relocation for Hampshire Crescent, July 2018 [pdf] 317 KB
2018 Enbridge Gas Distribution Line Relocation for Topflight Drive and Edwards Boulevard, July 2018 [pdf] 245 KB
2018 Enbridge Gas Distribution Line Relocation - Trailwood Drive to Bristol Road, July 2018 [pdf] 314 KB
2018 Rathburn Road West, July 2018 [pdf] 176 KB
2018 Letter to Residents [pdf] 163 KB
2018 Revised Schedule, October 2018 [pdf] 143 KB
2018 Courtneypark Drive, July 2018 [pdf] 175 KB
2018 Edwards Boulevard, July 2018 [pdf] 167 KB
2018 John Street, June 2018 [pdf] 117 KB
2018 Robert Speck Parkway, June 2018 [pdf] 190 KB
2018 Kingsway Drive, May 2018 [pdf] 226 KB
2018 Longside Drive and Admiral Boulevard, May 2018 [pdf] 10.3 MB
2018 Telecom Network Relocations, Winter 2018 [pdf] 83 KB
2018 Cooksville, Fall 2017 [pdf] 72 KB
2018 Mineola, Fall 2017 [pdf] 100 KB
2018 Mobilinx boards - Fall HuLRT open house [pdf] 105 KB
2018 MX boards - Fall HuLRT open house [pdf] 17.7 MB
2018 Renderings - Fall HuLRT open house [pdf] 25.1 MB
2018 Alternative Financing and Procurement (AFP) [pdf] 42 KB
2018 Hurontario LRT Shortlisted Teams [pdf] 121 KB
2017 Hurontario LRT Rollout Map 1 [pdf] 16.6 MB
2017 Hurontario LRT Rollout Map 2 [pdf] 15.3 MB
2017 Hurontario LRT Rollout Map 3 [pdf] 5.5 MB
2016 Hurontario LRT Benefits Case Analysis [pdf] 4.2 MB
2014 Statement of Completion [pdf] 353 KB
2014 Letter to the Proponent Team [pdf] 701 KB
2014 Hurontario Notice to Proceed [pdf] 281 KB

Back to top

Kerr Street Underpass Project

Date Document Name Type of Information File Size
2021 2021 Pipeline Activity - Update [pdf] 49.7 KB
2019 May 2, 2018 – Public Meeting #1 [pdf] 448 KB
2018 Display Boards [pdf] 2.19 MB

Back to top

Kipling Transit Hub

Date Document Name Type of Information File Size
2020 Kiss and Ride Changes [pdf] 666 KB
2020 Public Meeting – February 6, 2020 - Presentation [pdf] 1.86 MB
2017 Update: Kipling Mobility Hub Study – May 11, 2017 [pdf] 375 KB
2017 Public Meeting – April 4, 2017 - Presentation [pdf] 0.98 MB
2015 Kipling Bus Terminal Feasibility Study [pdf] 5.03 MB
2015 Appendix A: Transportation Analysis [pdf] 5.01 MB
2015 Appendix B: Preliminary Drawings [pdf] 20.4 MB
2014 Public Meeting – July 15, 2014 - Display boards [pdf] 13.9 MB

Back to top

Kitchener Line

Date Document Name Type of Information File Size
30/06/2022 West Toronto Railpath Tree Clearing and Vegetation Removal June 2022 [pdf] 274 KB
13/06/2022 Kitchener Fourth Track Construction June 2022 [pdf] 469 KB
10/05/2022 Kitchener GO Rail Expansion Project Background [pdf] 541 KB
2021 Weston Road Drilling Activities [pdf] 447 KB
2021 Level Crossing Improvements - Daytime Road Closure: Duke Street, Kitchener [pdf] 237 KB
2021 Geotechnical Investigation North of St. Clair W. Rail Crossing – Weekend, Day & Night Work [pdf] 295 KB
2021 Phase 2 Environmental Site Assessment Drilling Activities Required: 139-153 Weston Road Toronto (July 16) [pdf] 376 KB
2021 Phase 2 Environmental Site Assessment Drilling Activities Required: 139-153 Weston Road Toronto [pdf] 387 KB
2019 October 23, 2019 Public Meeting [pptx] 3.4 MB
2019 October 23, 2019 Display Boards [pdf] 67.3 MB

Back to top

Lakeshore East Line

Date Document Name Type of Information File Size
03/05/2022 Woodbine Bridge Stage 1 & 2: Centre Pier & Abutment Work - May 2022 to December 2022 [pdf] 339 KB
03/05/2022 Day and Night Work: Woodbine Avenue to Main Street – January to October 2022 [pdf] 308 KB
25/04/2022 Night Work: Utility Relocations between Pape Avenue and Kennedy Road - April 2022 to December 2023 [pdf] 431 KB
21/04/2022 Eglinton GO Station Tie Replacement - April 18-25 [pdf] 665 KB
19/04/2022 Rouge River Bridge Rehabilitation – Weekend Trail Closure - April 22-24 [pdf] 377 KB
01/04/2022 Day & Night Work: Victoria Park Avenue to Main Street Construction Update - April 2022 to May 2023 [pdf] 525 KB
18/03/2022 Scarborough Golf Club Road Grade Separation Project Update Information as of March 16, 2022 [pdf] 562 KB
18/03/2022 Night Work: Retaining Walls Construction April 2022 - January 2023 [pdf] 478 KB
14/03/2022 Day and Night Work: Jones Ave. to Pape Ave. April 2022 to May 2023 [pdf] 435 KB
14/03/2022 Day and Night Work: Greenwood Ave. to Jones Ave. April 2022 to May 2023 [pdf] 439 KB
14/03/2022 Day and Night Work: Coxwell Ave. to Greenwood Ave. April 2022 to May 2023 [pdf] 442 KB
28/02/2022 Lakeshore East, West Corridor Expansion - Arborist Report [pdf] 27.6 MB
08/02/2022 Day and Night Work: Wolcott Ave. to Warden Ave. [pdf] 493 KB
03/02/2022 An open letter to the residents surrounding Small’s Creek [pdf] 140 KB
02/02/2022 Review of Alternative Proposals – Small’s Creek Retaining Wall [pdf] 2.49 MB
20/01/2022 Day and Night Work: Small’s Creek Area as early as February 2022 to May 2023 [pdf] 415 KB
19/01/2022 Upcoming Construction Work as early as January 31, 2022 to December 2022 [pdf] 328 KB
2021 Small's Creek – Culvert Replacement and Retaining Wall Fact Sheet, December 2021 [pdf] 1.45 MB
2021 Tree and Vegetation Removal, December 2021 to mid-January 2022 [pdf] 305 KB
2021 Vegetation and Tree Clearing - Inside - Lakeshore East Joint Corridor, January 2022 [pdf] 334 KB
2021 Investigative Work Starting December 2021 [pdf] 370 KB
2021 Firewood Giveaway at Rouge Hill GO Station, December 2021 [pdf] 406 KB
2021 Temporary Laydown Area at Rouge Hill GO, November 2021 [pdf] 349 KB
2021 Lakeshore East Early Works: Construction Notice, December 2021 – June 2023 [pdf] 333 KB
2021 Night Work: Vegetation Removal between Birchmount Road and Kennedy Road, as soon as late-December 2021 to March 2022 [pdf] 299 KB
2021 Rail Corridor Vegetation and Tree Clearing, Fall 2021 [pdf] 362 KB
2021 Night Work: Lagging Installation and Backfill at Retaining Wall 9, Mid-November 2021 [pdf] 369 KB
2021 Night Work: Utility Relocation and Grading, Mid-November 2021 [pdf] 265 KB
2021 Eglinton GO Station Tie Replacement, November 2021 [pdf] 577 KB
2021 Grey Abbey Culvert Beaver Baffle, November 2021 [pdf] 865 KB
2021 Rouge River Bridge Rehabilitation, October/November 2021 [pdf] 371 KB
2021 Retaining Walls 6 & 7 Construction, as early as November 8, 2021 to February 2022 [pdf] 403 KB
2021 Danforth Bridge Stage 1: Pier Installation, as early as November 1, 2021 to Late December 2021 [pdf] 347 KB
2021 Warden Bridge Stage 1: Pier Installation, as early as November 1, 2021 to Late December 2021 [pdf] 189 KB
2021 Night Work: Small’s Creek Preparatory Vegetation Removal Early November 2021 to December 2021 [pdf] 440 KB
2021 Eglinton GO Station Tie Replacement [pdf] 607 KB
2021 Night Work: Unity Road Access Point Construction [pdf] 357 KB
2021 Notice: Retaining Wall Construction from Main St to Victoria Park Ave [pdf] 385 KB
2021 Overnight Construction Activities Notice: Jones Avenue to Coxwell [pdf] 436 KB
2021 Notice: Rouge River Bridge Rehabilitation [pdf] 1.87 MB
2021 Notice: Rail Corridor Vegetation and Tree Clearing [pdf] 302 KB
2021 Notice: Overnight Construction – Jones Ave to Coxwell Ave [pdf] 442 KB
2021 Notice: Overnight Construction – Woodbine Ave to Warden Ave [pdf] 425 KB
2021 Vegetation and tree clearing within the rail corridor from the DVP to Eastern Avenue [pdf] 302 KB
2021 Night Work: Utility Work in Woodrow Park [pdf] 309 KB
2021 Eglinton GO Station Geotechnical Work [pdf] 384 KB
2021 Danforth Bridge Work and Traffic Impacts [pdf] 264 KB
2021 Warden Avenue Bridge Construction Notice [pdf] 284 KB
2021 Warden Avenue Storm Sewer Work [pdf] 465 KB
2021 Utility Investigative Work - Eastwood Avenue [pdf] 439 KB
2021 Lakeshore East Early Works: Overnight Utility Work at Eastwood [pdf] 299 KB
2021 Woodbine Ave - Reduction to Lane Widths Due to Bridge Widening Work [pdf] 306 KB
2021 Lakeshore East Early Works: Overnight Utility Work (Pape to Gerrard) [pdf] 351 KB
2021 Lakeshore East Early Works: Overnight Utility Work (Main to Norwood) [pdf] 358 KB
2021 Eglinton GO Station Cable Splicing Work [pdf] 541 KB
2021 Lakeshore East Early Works: Precondition Surveys [pdf] 362 KB
2021 Lakeshore East Early Works: Retaining Walls 6 & 7 [pdf] 376 KB
2021 Lakeshore East Early Works: Woodbine Bridge Widening [pdf] 382 KB
2021 Noise Mitigation: Pape Ave to Kennedy Rd [pdf] 354 KB
2021 Lakeshore East Early Works: Geotechnical Work [pdf] 335 KB
2021 Lakeshore East Early Works: Wildwood Parking Lot [pdf] 437 KB
2021 Highland Creek Rail Bridge Canadian Navigable Waters Act – Public Notice [pdf] 106 KB
2021 Lakeshore East Early Works: Retaining Walls [pdf] 419 KB
2021 Trees and Vegetation: Small’s Creek [pdf] 1.21 MB
2021 Small’s Creek Culvert, Retaining Walls and Restoration Plan [pptx] 45.2 MB
2021 Lakeshore East Early Works: Precondition Surveys [pdf] 421 KB
2021 Retaining Walls: Lakeshore East Expansion [pdf] 272 KB
2021 Lakeshore East Rail Corridor Project Update on Scarborough Golf Club Road: February/March 2021 [pdf] 288 KB
2021 Lakeshore East Early Works: Clearing & Grubbing [pdf] 407 KB
2020 C-320 Projection of slope [pdf] 702 KB
2020 Lakeshore East Corridor Infrastructure, West Corridor Expansion - Drainage and Stormwater Management Report [pdf] 20.3 MB
2020 Lakeshore East, West Corridor Expansion - Arborist Report [pdf] 22.2 MB
2020 Early Works: Pape Ave to Kennedy Rd [pdf] 324 KB
2020 Rhodes Avenue - Manhole Construction [pdf] 265 KB
2020 Enbridge Gas Meter Relocation Work [pdf] 390 KB
2020 Lakeshore East (West) - Early Works [pdf] 401 KB
2020 Track Crossing Installation Night Work [pdf] 354 KB
2020 Beechgrove Drive and Highland Creek Bridge Night Work [pdf] 264 KB
2020 Fibre Optic Cable Relocation Work [pdf] 471 KB
2020 Manse Road and Beechgrove Drive Crossing Bungalow Upgrade Work [pdf] 660 KB
2020 New Access and Laydown Areas [pdf] 159 KB
2020 Underground Power Line Crossings at Markham Road Area [pdf] 175 KB
2020 Chesterton Shores Level Crossing Closure [pdf] 151 KB
2020 Scarborough GO Station Night Work [pdf] 251 KB
2020 Gate Installation at Chesterton Shores Level Crossing [pdf] 160 KB
2020 Level Crossing Improvements: Anti Trespass Mat Installation [pdf] 200 KB
2020 Overnight Fibre Optic Cable Relocation Between Kennedy Road and Pape Avenue [pdf] 170 KB
2020 Community Advisory Committee Meeting #7 Presentation [pdf] 40.2 MB
2020 Community Advisory Committee Meeting #7 Summary [pdf] 2.1 MB
2020 Community Advisory Committee Meeting #6 Presentation [pdf] 13.4 MB
2020 Community Advisory Committee Meeting #6 Summary [pdf] 2.3 MB
2019 Community Advisory Committee Questions and Answers [pdf] 160 KB
2019 Community Advisory Committee Meeting #5 Summary [pdf] 218 KB
2019 Investigative Work - Woodrow Pedestrian Bridge [pdf] 156 KB
2019 Scarborough Golf Club Road Grade Separation Update Meeting Notice [pdf] 231 KB
2019 Scarborough Golf Club Road Grade Separation Update Meeting Materials [pdf] 1.2 MB
2018 Overnight Investigative Work - Birchmount Road Bridge (and vicinity) [pdf] 143 KB
2018 Update - Overnight Investigative Work at Small's Creek [pdf] 144 KB
2018 Update Overnight Investigative Work at Small's Creek extended dates [pdf] 145 KB
2018 Upcoming Night Work (Between Queen Street East Rail Bridge to Kennedy Road Rail Bridge) [pdf] 46 KB
2018 Upcoming Night Work in Durham (Henry St., Bayly St., Harwood Ave and Durham Junction) [pdf] 49 KB
2018 Overnight Investigative Work Danforth GO Station [pdf] 151 KB
2018 Overnight Investigative Work Egan Avenue/Kimridge Avenue [pdf] 146 KB
2018 Lakeshore East Rail Corridor Overnight Track Work Scarborough [pdf] 148 KB
2018 Overnight Utility Work Liverpool Road to Galloway Road [pdf] 149 KB
2018 Community Advisory Committee Action Items for Meeting #5 [pdf] 755 KB
2018 Community Advisory Committee RFP Meeting Summary [pdf] 2.2 MB
2018 Community Advisory Committee Meeting #4 Summary [pdf] 1.9 MB
2018 Community Advisory Committee Meeting #3 Summary [pdf] 754 KB
2018 Community Advisory Committee Meeting #3 Leave Behind [pdf] 536 KB
2018 Community Advisory Committee Memorandum [pdf] 63 KB
2018 Community Advisory Committee Comments and Recommendations [pdf] 19.2 MB
2018 RFQ/RFP Documents and Procurement Process Meeting Summary [pdf] 205 KB
2018 RFQ/RFP Documents and Procurement Process Outstanding Questions and Answers [pdf] 106 KB
2018 Community Advisory Committee Meeting #2 Presentation [pdf] 1.2 MB
2018 Community Advisory Committee Meeting #2 Meeting Summary [pdf] 2.3 MB
2018 Community Advisory Committee Meeting #2 Outstanding Questions and Answers [pdf] 114 KB
2018 Community Advisory Committee Meeting #1 Handout [pdf] 798 KB
2018 Community Advisory Committee Meeting #1 Meeting Summary [pdf] 196 KB
2017 Rouge Hill GO Station Track Maintenance [pdf] 171 KB
2017 Woodbine and Birchmount Bridge Construction Update [pdf] 126 KB

Back to top

Lakeshore West Line

Date Document Name Type of Information File Size
10/08/2022 Vegetation and Tree Clearing August 15 - November 7 [pdf] 315 KB
28/07/2022 2082 Queensway Drive Demolition Work [pdf] 102 KB
28/07/2022 Vegetation and Tree Clearing August 1, 2022 - October 10 [pdf] 301 KB
28/07/2022 Vegetation and Tree Clearing August 1, 2022 - September 26 [pdf] 173 KB
13/07/2022 Vegetation and Tree Clearing July 21, 2022 - Aug 25 [pdf] 312 KB
17/06/2022 Upcoming Building Demolitions [pdf] 251 KB
13/06/2022 Early Works for Burloak Drive Grade Separation Starting June/July 2022 [pdf] 284 KB
25/05/2022 Vegetation and Tree Clearing [pdf] 373 KB
2021 Rail Corridor Vegetation and Tree Clearing [pdf] 334 KB
2019 CN Hamilton Junction Expansion work for Future Increased GO Service (Construction Notice September 2019) [pdf] 381 KB
2019 Lorne Park Road-Rail Crossing Closure (Construction Notice April 2019) [pdf] 162 KB
2018 Bringing more transit to Peel and Halton Regions (delivered to the Credit Valley PROBUS Club) [pdf] 4.6 MB
2018 Port Credit Mobility Hub update (delivered to the Hurontario LRT south corridor committee on March 1, 2018) [pdf] 663 KB

Back to top

Long Branch GO Station

Date Document Name Type of Information File Size
05/08/2022 Long Branch GO Station Improvements - Project Backgrounder [pdf] 1.03 MB
02/08/2022 Overnight Geotechnical Investigation at Long Branch GO Station August 08 to 25, 2022 [pdf] 394 KB
21/06/2022 Geotechnical Investigation at Long Branch GO Station Parking Lot - July 4, 2022 [pdf] 374 KB
21/06/2022 Overnight Geotechnical Investigation within Long Branch GO Rail Corridor - June 24-25 2022 [pdf] 306 KB
06/06/2022 Subsurface Utility Engineering Investigation at Long Branch GO Station Parking Lot - June 2-8 2022 [pdf] 293 KB
20/05/2022 Geotechnical Investigation at Long Branch GO Station Parking Lot Starting in Late May 2022 [pdf] 233 KB
2018 GO Expansion Update Public Meeting: Mimico and Long Branch – July 2018 [pdf] 441 KB
2018 Public Open House Boards – July 5, 2018 [pdf] 2.06 MB

Back to top

Milton Line

Date Document Name Type of Information File Size
17/06/2022 Upcoming Building Demolitions [pdf] 251 KB
2017 Update II: Milton Rail Corridor Second Track Reinstatement [pdf] 560 KB
2017 Kipling GO Station [pdf] 1 MB
2017 Update: Milton Rail Corridor Second Track Reinstatement [pdf] 182 KB
2017 Milton Rail Corridor Second Track Reinstatement [pdf] 182 KB
2016 Streetsville GO Station Parking Expansion [pdf] 170 KB

Back to top

Mimico GO Station

Date Document Name Type of Information File Size
2018 GO Expansion Update: Mimico and Long Branch [pdf] 441 KB
2018 Public Open House Boards [pdf] 2.1 MB
2018 Mimico GO Transit Oriented Development Presentation to Metrolinx Board [pdf] 233 KB
2018 Streetsville GO Station Parking Expansion [webpage]
2017 Request for Qualifications Issued for Lakeshore West Corridor Infrastructure Improvements Project [webpage]

Back to top

Mississauga Transitway

Date Document Name Type of Information File Size
2015 Renforth Gateway Open House Presentation [pdf] 1.5 MB
2012 Mississauga Bus Rapid Transit (BRT) Project - West Segment - Public Information Centre Presentation [pdf] 2.2 MB

Back to top

Ontario Line

Date Document Name Type of Information File Size
Whole Line
11/01/2022 Site visits along the Ontario Line [pdf] 235 KB
11/01/2022 Surveying along the Ontario Line [pdf] 284 KB
West Segment
17/06/2022 Surveying in King and Bathurst area June/July [pdf] 400 KB
17/06/2022 Surveying in King and Niagara area June/July [pdf] 372 KB
17/06/2022 Pre-Construction Activities at Fort York (12 Strachan) starting as early as June 13 [pdf] 399 KB
07/06/2022 Geotechnical Instrumentation and Monitoring Program at Exhibition Portal starting as early as June 01 [pdf] 663 KB
18/05/2022 UPDATED - Overnight investigative drilling work on Bathurst Street near King Street West, initial start date March 14 [pdf] 214 KB
10/03/2022 Tree removals & overnight demolition at Exhibition early works site - starting as early as March 11, 2022 [pdf] 151 KB
28/01/2022 Overnight CCTV investigative work on Spadina Avenue near Queen Street West - starting as early as January 30 [pdf] 204 KB
12/01/2022 Demolition at 1/1A Atlantic Avenue to get ready for Exhibition Station early works - starting as early as January 17 [pdf] 199 KB
10/01/2022 Investigative hydrovac work on King Street West and Bathurst Street - starting as early as January 10 [pdf] 202 KB
10/01/2022 Investigative drilling work and monitoring well installation on Ordnance Street near Strachan Avenue - starting as early as January 10 [pdf] 190 KB
2021 Investigative drilling work on Graffiti Alley - starting as early as December 15 [pdf] 213 KB
2021 Overnight investigative drilling work in the rail corridor near Exhibition GO Station - starting as early as December 13 [pdf] 243 KB
2021 Preparatory works at 1 Atlantic Avenue to get ready for Exhibition Station early works - starting as early as December 7 [pdf] 212 KB
2021 Surveying on Graffiti Alley and Spadina Avenue - starting as early as October 8 [pdf] 212 KB
2021 Overnight investigative drilling work on Bathurst Street near King Street West - starting as early as September 14 [pdf] 203 KB
2021 Surveying on Strachan Avenue near Fleet Street and Douro Street - starting as early as September 13 [pdf] 210 KB
2021 Environmental Site Assessment at 1 Atlantic Avenue - starting as early as September 1 [pdf] 197 KB
2021 Preview Inspections between Exhibition and Osgoode Stations - starting as early as September 24 [pdf] 197 KB
2021 Overnight investigative hydrovac work on Queen Street in various locations – starting as early as August 9 [pdf] 273 KB
Downtown Segment
09/08/2022 Early Works for Southern Section of Moss Park - starting as early as August 15 [pdf] 202 KB
09/08/2022 Early Works for Southern Section of Corktown Commons Park - starting as early as August 11 [pdf] 389 KB
04/08/2022 Overnight investigative hydrovac work on Adelaide between York and Victoria - starting as early as August 8 [pdf] 294 KB
14/07/2022 Overnight investigative drilling work at Queen Street West and University Avenue - starting as early as July 18 [pdf] 251 KB
14/07/2022 Overnight investigative hydrovac work on Adelaide between York and Victoria - starting as early as July 18 [pdf] 309 KB
30/06/2022 Installation of new fencing at Corktown early works site to prepare for environmental assessments - starting July 2022 [pdf] 299 KB
23/06/2022 Early Works for Southern Section of Moss Park - starting as early as June 29 [pdf] 289 KB
23/06/2022 Overnight Water Level Monitoring at Yonge St and Queen St - starting as early as June 27 [pdf] 347 KB
13/06/2022 Geotechnical Instrumentation and Monitoring Program in Corktown area - starting June 2022 [pdf] 268 KB
13/06/2022 Geotechnical Instrumentation and Monitoring Program in the Moss Park area - starting June 2022 [pdf] 280 KB
13/06/2022 Geotechnical Instrumentation and Monitoring Program in the Queen and University area - starting June 2022 [pdf] 296 KB
13/06/2022 Geotechnical Instrumentation and Monitoring Program in the Queen and Yonge area - starting June 2022 [pdf] 284 KB
08/06/2022 Update: Overnight water level monitoring on Queen Street between James Street and Victoria Street - starting as early as June 13 [pdf] 251 KB
01/06/2022 Pre-Construction Activities for the Southern Section of Moss Park - starting as early as June 3 [pdf] 266 KB
30/05/2022 Overnight water level monitoring on Queen Street between James Street and Victoria Street - starting as early as June 1 [pdf] 248 KB
18/05/2022 Investigative drilling work at Moss Park near Queen Street and Sherbourne Street - starting as early as May 19 [pdf] 214 KB
12/05/2022 Overnight investigative drilling work on Queen Street between James Street and Victoria Street - starting as early as May 16 [pdf] 209 KB
11/05/2022 Overnight investigative hydrovac work on Adelaide between York and Victoria - starting as early as May 18 [pdf] 313 KB
11/05/2022 Overnight hydrovac test pits at the intersection of Yonge Street and Queen Street - starting as early as May 16 [pdf] 184 KB
28/04/2022 Overnight investigative drilling work at York and Queen and York and Adelaide - starting as early as May 2 [pdf] 313 KB
26/04/2022 Demolition and archaeological investigations at the Corktown early works site - update as of April 26 [pdf] 415 KB
21/04/2022 Utility Locating at Moss Park - starting as early as April 22 [pdf] 274 KB
19/04/2022 Installation of temporary sidewalk overhead protection at Corktown early works site - starting as early as April 19 [pdf] 371 KB
29/03/2022 Investigative hydrovac work on Simcoe Street near Queen Street West - starting as early as March 30 [pdf] 251 KB
23/03/2022 Overnight investigative drilling work on Queen Street and James Street up to Victoria Street (Work extended) - starting as early as March 28 [pdf] 659 KB
18/03/2022 Investigative hydrovac work at Corktown Common - starting as early as March 21 [pdf] 258 KB
17/03/2022 Daytime and overnight investigative hydrovac work at Cherry Street underpass and Don Yard (rail corridor) - starting as early as March 21 [pdf] 253 KB
15/03/2022 Installation of sidewalk overhead protection at Corktown early works site - starting as early as March 16 [pdf] 395 KB
14/03/2022 Overnight investigative hydrovac work at Queen Street East and Victoria Street - starting as early as March 15 [pdf] 394 KB
09/03/2022 Borehole Testing on Distillery Lane - starting as early as March 10 [pdf] 475 KB
03/03/2022 Demolition at Corktown early works site - starting as early as March 7 [pdf] 393 KB
03/03/2022 Environmental Site Assessment at Don Yard - starting as early as March 7 [pdf] 243 KB
03/03/2022 Overnight investigative drilling work on Queen Street and James Street up to Victoria Street - starting as early as March 7 [pdf] 271 KB
01/03/2022 Don Yard Vegetation and Tree Removal Notice for Future Utility Relocation and Bridge Construction - March 2022 [pdf] 251 KB
17/02/2022 Overnight investigative CCTV work on Adelaide Street West and East - starting as early as February 22 [pdf] 321 KB
17/02/2022 Overnight investigative hydrovac work at Queen Street West and University Avenue - starting as early as February 22 [pdf] 216 KB
11/02/2022 Overnight investigative hydrovac work on Adelaide Street West and East - starting as early as February 14 [pdf] 213 KB
04/02/2022 Investigative hydrovac and CCTV work on Adelaide Street West and East - starting as early as February 7 [pdf] 211 KB
04/02/2022 Investigative drilling work in the Bell Media parking lot at 299 Queen Street West - starting as early as February 7 [pdf] 209 KB
31/01/2022 Overnight investigative hydrovac work on Richmond Street West and Yonge Street - starting as early as February 2 [pdf] 197 KB
27/01/2022 Tree removals at Corktown early works site - starting as early as February 1 [pdf] 404 KB
11/01/2022 Investigative drilling work at Queen Street West and James Street - starting as early as January 17 [pdf] 213 KB
11/01/2022 Overnight investigative hydrovac work on Simcoe Street near Queen Street West - starting as early as January 12 [pdf] 256 KB
2021 Overnight investigative hydrovac work on York Street between Richmond Street West and Adelaide Street West - starting as early as December 21 [pdf] 225 KB
2021 Investigative drilling work at Simcoe Street, near Queen West and Richmond West - starting as early as December 13 [pdf] 245 KB
2021 Investigative hydrovac work on King Street East at Berkeley Street - starting as early as December 7 [pdf] 202 KB
2021 Investigative drilling work at Queen Street West and James Street - starting as early as December 2 [pdf] 208 KB
2021 Investigative drilling work on Berkeley Street between Richmond Street East and Adelaide Street East - starting as early as December 2 [pdf] 193 KB
2021 Overnight hydrovac test pits in the rail corridor located in the Don Yard - starting as early as November 29 [pdf] 256 KB
2021 Early Works for Southern Section of Moss Park - starting as early as October 15 [pdf] 426 KB
2021 Overnight temporary crossing installation work in the rail corridor from Eastern Avenue to Logan Avenue - starting as early as October 25 [pdf] 393 KB
2021 Weekend archaeological work at the First Parliament Site - starting as early as October 23 [pdf] 264 KB
2021 Overnight investigative hydrovac work on York Street between Queen Street West and Adelaide Street West - starting as early as October 18 [pdf] 199 KB
2021 Archaeology, geotechnical and demolition work at the First Parliament Site - starting as early as October 1 [pdf] 271 KB
2021 Investigative drilling work on Berti Street near Queen Street East - starting as early as October 1 [pdf] 209 KB
2021 Investigative hydrovac work on Berkeley Street between Adelaide Street East and King Street East - starting as early as October 1 [pdf] 208 KB
2021 Overnight Investigative drilling work in Corktown Common Park - starting as early as September 19 [pdf] 241 KB
2021 Investigative drilling work on 250 Front Street East (Staples) - starting as early as September 13 [pdf] 239 KB
2021 Preview Inspections between Exhibition and Osgoode Stations - starting as early as September 24 [pdf] 197 KB
2021 Investigative drilling work on Front Street East - starting as early as August 16, 2021 [pdf] 194 KB
2021 Overnight investigative hydrovac work on Queen Street in various locations – starting as early as August 9 [pdf] 273 KB
2021 Topographic surveying on Albert Street between Bay Street and James Street - Starting as early as August 9 [pdf] 192 KB
East Segment
18/07/2022 Investigative drilling work along Strange Street near Queen Street East - starting as early as July 18 [pdf] 251 KB
14/07/2022 Investigative work along De Grassi Street near Queen Street East - starting as early as July 19 [pdf] 299 KB
14/07/2022 Investigative work near the Intersection of Gerard Street East and Carlaw Avenue - starting as early as July 19 [pdf] 310 KB
14/07/2022 Archaeological Investigations in the Logan Avenue Area - starting as early as July 13 [pdf] 302 KB
14/06/2022 Bat House Installation in Riverdale Park East - starting as early as June 27 [pdf] 365 KB
13/06/2022 Archaeological Investigations in the Logan Ave Area - starting as early as June 15 [pdf] 297 KB
01/06/2022 Hydrovac Utility Daylighting and Sewer Investigation Work Between Eastern Ave. and Pape Ave. - starting as early as May 16 [pdf] 251 KB
20/05/2022 Hydrovac Utility Daylighting and Sewer Investigation Work on Strange St. Between Eastern Ave. and Queen St E. - starting May 25 [pdf] 354 KB
13/05/2022 Surveying Work Along De Grassi St. And Wardell St. - starting as early as May 13 [pdf] 387 KB
25/04/2022 Surveying work at the intersection of Queen St E and Strange St - starting as early as April 25 [pdf] 431 KB
19/04/2022 Hydrovac Utility Daylighting and Sewer Investigation Work Between Eastern Ave. And Pape Ave. - starting as early as April 21 [pdf] 377 KB
13/04/2022 Surveying Work Between Eastern Ave. and Pape Ave. - starting as early as April 18 [pdf] 384 KB
05/04/2022 Survey of Telus Manholes at Logan Avenue - starting as early as April 7 [pdf] 338 KB
29/03/2022 Overnight Cable Relocation between Jones Avenue and Carlaw Avenue - starting as early as April, 2022 [pdf] 259 KB
28/03/2022 Overnight Cable Installation- Lake Shore East to Jones - starting as early as April, 2022 [pdf] 345 KB
24/03/2022 Investigative drilling work on De Grassi Street - starting as early as March 29 [pdf] 295 KB
24/03/2022 Investigative drilling work on Dibble St Parking Lot starting as early as March 29 [pdf] 269 KB
24/03/2022 Investigative drilling work on Saulter Street starting as early as March 29 [pdf] 284 KB
24/03/2022 Investigative drilling work on Thackeray St Parking Lot starting as early as March 29 [pdf] 294 KB
24/03/2022 Investigative drilling work on Dundas St E starting as early as March 28 [pdf] 299 KB
24/03/2022 Investigative drilling work on Logan Ave starting as early as March 28 [pdf] 267 KB
24/03/2022 Investigative drilling work on Tiverton Avenue starting as early as March 25 [pdf] 279 KB
24/03/2022 Investigative drilling work on Wardell St starting as early as March 25 [pdf] 246 KB
24/03/2022 Investigative Daylighting work in the rail corridor and Jimmie Simpson Park from Paisley Avenue to Queen Street East. - starting as early as March 28 [pdf] 279 KB
22/03/2022 Overnight / Daytime Sewer Investigation Work Between Queen St. E. And Gerrard St. E. - starting as early as March 28 [pdf] 211 KB
15/03/2022 Overnight investigative work in the Metrolinx rail corridor from Carlaw Avenue to Thackrey Street – starting as early as March 20 [pdf] 312 KB
24/01/2022 Utility survey along Lewis Street between Eastern Avenue and Queen Street East – starting as early as January 25 [pdf] 370 KB
2021 Overnight Investigative drilling work in the rail corridor from Carlaw Avenue to Jones Avenue – starting as early as January 10 [pdf] 437 KB
2021 Overnight investigative drilling work in the rail corridor from Carlaw Avenue to Eastern Avenue – starting as early as November 8 [pdf] 369 KB
2021 HydroVac Daylighting & Bridge Drainage Investigation between Eastern Avenue and Pape Avenue – starting as early as October 22 [pdf] 427 KB
2021 Overnight Investigative drilling work near the Logan Avenue Bridge – starting as early as October 4 [pdf] 203 KB
2021 Utility survey between Eastern Avenue and Pape Avenue – starting as early as September 22 [pdf] 660 KB
2021 Overnight Investigative drilling work near the Logan Avenue Bridge – starting as early as September 7 [pdf] 203 KB
2021 Capturing ambient sound and video information at Tiverton Parkette near the rail corridor – starting as early as August 31 [pdf] 219 KB
2021 Capturing ambient sound and video information in Jimmie Simpson Park – starting as early as August 31 [pdf] 227 KB
2021 Investigative drilling work in parking lot at 11 Sunlight Park Road – starting as early as August 23 [pdf] 226 KB
2021 Investigative drilling work within the Metrolinx rail corridor from Queen Street East to Gerrard Street East – starting as early as June 24 [pdf] 283 KB
North Segment
10/08/2022 Investigative drilling work along Danforth Ave Between Pape Ave to Eaton Ave. Extended Until August 31 [pdf] 318 KB
10/08/2022 Geotechnical Drilling along Browning Ave. near Pape Ave. - starting as early as August 22 [pdf] 350 KB
02/08/2022 Work on the DVP Southbound in the vicinity of the Leaside Bridge - starting as early as August 14 [pdf] 304 KB
02/08/2022 Work near the DVP Southbound in the vicinity of the Lower Don River Trail - starting as early as August 6 [pdf] 276 KB
28/07/2022 Work on the DVP Southbound between Don Mills Rd. and Bayview Ave. - starting as early as August 5 [pdf] 310 KB
20/07/2022 Investigative drilling work along Overlea Blvd, Thorncliffe Park Drive and Millwood Road - starting as early as July 25 [pdf] 278 KB
14/07/2022 Groundwater Sampling near Pape Ave. and Browning Ave. - starting as early as July 25 [pdf] 289 KB
14/07/2022 Maintenance and verification of sewage system monitors along the Ontario Line - starting as early as July 18 [pdf] 251 KB
14/07/2022 Surveying near the Eglinton and Don Mills - starting as early as July 18 [pdf] 303 KB
08/07/2022 Investigative drilling work at the intersection of Muriel Ave. and Gertrude Place - Work Extended Until July 15 [pdf] 340 KB
08/07/2022 Groundwater Sampling near Riverdale Ave. and Pape Ave. - starting as early as July 18 [pdf] 279 KB
30/06/2022 Surveying work on Millwood Rd south of Overlea Blvd - starting as early as July 5 [pdf] 348 KB
30/06/2022 Surveying work on Don Mills and Gateway Blvd - starting as early as July 5 [pdf] 350 KB
23/06/2022 Geotechnical drilling along Pape Ave from Hopedale to Poucher Street - starting as early as July 4 [pdf] 289 KB
22/06/2022 Bat House Installation in Cottonwood Flats - starting as early as June 27 [pdf] 396 KB
22/06/2022 Investigative drilling work along Danforth Ave Between Pape Ave to Eaton Ave. - starting as early as June 27 [pdf] 391 KB
17/06/2022 Investigative drilling work at the intersection of Muriel Ave. and Gertrude Place - starting as early as June 20 [pdf] 290 KB
13/06/2022 Groundwater Sampling along Pape Ave., Riverdale Ave. and Langley Ave. - starting as early as June 15 [pdf] 300 KB
13/06/2022 Investigative drilling work along Danforth Ave Between Pape Ave to Eaton Ave. - starting as early as June 15 [pdf] 296 KB
08/06/2022 Investigative hydrovac work near Hopedale Avenue and Minton Place - starting as early as June 15 [pdf] 251 KB
30/05/2022 Investigative drilling work along Pape Ave., from Riverdale Ave., to Poucher Street. - starting as early as June 3 [pdf] 391 KB
30/05/2022 Hydrovac work along Pape Ave., Carlaw Ave., Riverdale Ave., and Langley Ave. - starting as early as June 3 [pdf] 155 KB
25/05/2022 UPDATED - Hydrovac test pits along Overlea Boulevard and Thorncliffe Park Drive - starting as early as May 24 [pdf] 255 KB
20/05/2022 Maintenance of sewage system monitors along the Thorncliffe Park Drive and Wicksteed Drive - starting as early as May 24 [pdf] 342 KB
20/05/2022 Demolition at 50 Village Station Road to get ready for MSF early works - starting as early as June 1 [pdf] 233 KB
12/05/2022 Investigative drilling work along Pape Ave. and Riverdale Ave. - starting as early as May 16 [pdf] 271 KB
11/05/2022 Installation of sewage system monitors along the Thorncliffe Park Drive and Wicksteed areas of the Ontario Line - starting as early as May 12 [pdf] 362 KB
05/05/2022 Surveying in Pape area for the Ontario Line - starting early May 2022 [pdf] 476 KB
05/05/2022 Surveying in Gerrard Portal area for the Ontario Line - starting early May 2022 [pdf] 490 KB
04/05/2022 Surveying at Minton Place for the Ontario Line - starting as early as May 2 [pdf] 476 KB
27/04/2022 Investigative drilling work along Pape Ave. and Riverdale Ave. - starting as early as April 30 [pdf] 294 KB
21/04/2022 Overnight investigative hydrovac work on Danforth Ave. at Eaton Ave. - starting as early as April 27 [pdf] 371 KB
21/04/2022 Geotechnical drilling in the Overlea to Millwood and Thorncliffe Park area - starting as early as April 25 [pdf] 187 KB
21/04/2022 Surveying in the North Segment of the Ontario Line - starting as early as April 25 [pdf] 639 KB
19/04/2022 Geotechnical drilling Don Mills Rd and Eglinton Ave East. - starting as early as April 18 [pdf] 371 KB
14/04/2022 Investigative drilling work along Pape and Riverdale Ave. & Pape and Langley Ave. - starting as early as April 18 [pdf] 299 KB
14/04/2022 Hydrovac work along Pape Ave from Sammon Ave to Lipton Ave. - starting as early as April 14 [pdf] 296 KB
13/04/2022 Investigative drilling work along Pape from Riverdale Ave to Poucher Street. - starting as early as April 18 [pdf] 282 KB
07/04/2022 Investigative hydrovac work near Gamble Ave., Cosburn Ave. and Gowan Ave. - starting as early as April 11 [pdf] 297 KB
30/03/2022 Surveying along Eaton Ave and Danforth Ave - starting as early as March 31 [pdf] 251 KB
08/03/2022 Hydrovac work along Pape Ave, Carlaw, Riverdale Ave. and Langley Ave - starting as early as March 9 [pdf] 343 KB
01/03/2022 Vegetation and Tree Clearing Notice: Preparing for Geotechnical Investigations - starting as early as March 1 [pdf] 273 KB
18/02/2022 Investigative CCTV work along Pape Ave, Carlaw, Riverdale Ave. and Langley Ave - starting as early as February 22 [pdf] 286 KB
10/02/2022 Surveying near Eglinton and Don Mills - starting as early as February 10 [pdf] 373 KB
10/01/2022 Surveying along the Ontario Line: Millwood Drive to Eglington/Science Centre area - starting as early as January 10 [pdf] 402 KB
2021 Surveying on Carlaw Avenue, Riverdale Avenue,and Langley Avenue - starting as early as November 22 [pdf] 340 KB
2021 Investigative drilling work at Gertrude Place & Muriel Avenue - starting as early as November 11 [pdf] 204 KB
2021 Capturing ambient sound and video information at and near the Ontario Science Centre - starting as early as October 26 [pdf] 614 KB
2021 Capturing ambient sound and video information at Minton Place - starting as early as October 22 [pdf] 214 KB
2021 Capturing ambient sound and video information at 1 Leaside Park Dr, 20 Overlea Blvd, and 10-14 William Morgan Dr - starting as early as October 22 [pdf] 599 KB
2021 Overnight investigative subsurface work along Pape Avenue and Danforth Avenue - October 6 and 7 [pdf] 291 KB
2021 Investigative drilling work at 1 Thorncliffe Park Dr - starting as early as October 4 [pdf] 251 KB
2021 Site visits in Don Valley - starting as early as September 29 [pdf] 402 KB
2021 Investigative drilling work at 40 Beth Nealson Dr - starting as early as September 13 [pdf] 232 KB

Back to top

Richmond Hill Line

Date Document Name Type of Information File Size
2021 GO Expansion: Richmond Hill [pdf] 1.80 MB
2017 Oriole GO Pedestrian Pathway Closure [pdf] 546 KB
2016 Richmond Hill Corridor Maintenance Work [pdf] 245 KB

Back to top

Rutherford GO Station

Date Document Name Type of Information File Size
2021 Rutherford Road Closure – East - Diversion Track Activation [pdf] 188 KB
2020 Rutherford Road Storm Sewer Installation Construction Notice - October 2020 [pdf] 435 KB
2020 Rutherford Community Notice – July 2020 [pdf] 362 KB
2020 Rutherford Community Notice – May 2020 [pdf] 459 KB

Back to top

Scarborough Subway Extension

Date Document Name Type of Information File Size
18/07/2022 Headwall Construction - Lawrence and McCowan (July 2022) [pdf] 155 KB
08/06/2022 Headwall Construction - Danforth Rd. at Barrymore Rd. (June 2022) [pdf] 251 KB
03/06/2022 Headwall Construction - McCowan [between Brimorton Dr. and St. Andrews Rd.] (June 2022) [pdf] 603 KB
19/07/2022 Headwall Construction - Highway 401 and McCowan (March 2022) [pdf] 139 KB
17/05/2022 Extraction Shaft Construction Update (May 2022) [pdf] 265 KB
02/05/2022 Sheppard Avenue Gas Main Relocation (May 2022) [pdf] 391 KB
02/05/2022 Headwall Construction - McCowan and Ellesmere (May 2022) [pdf] 388 KB
12/04/2022 Headwall Construction - Scarborough Centre (April 2022) [pdf] 367 KB
11/04/2022 Headwall Construction - Sheppard and McCowan (February 2022) [pdf] 310 KB
23/02/2022 Tree Removals (February 2022) [pdf] 297 KB
2021 Launch shaft construction update (October 2021) [pdf] 546 KB
2021 Extraction shaft construction notice (October 2021) [pdf] 327 KB
2021 Launch shaft construction update (July 2021) [pdf] 381 KB
2021 Piling work at launch shaft site (June 2021) [pdf] 474 KB
2021 Upcoming Works for the Scarborough Subway Extension: Site Demolition [pdf] 316 KB
2021 Deep Benchmark Surveys associated with the Scarborough Subway Extension [pdf] 1.08 MB
2020 Drilling/Surveying work on McCowan Road [pdf] 114 KB
2019 Drilling/Surveying work on McCowan Road between Milner Avenue and Nugget Road [pdf] 260 KB
2019 Drilling/Surveying work on McCowan Road, Grangeway Avenue and Consilium Place [pdf] 267 KB

Back to top

Scarborough Town Centre

Date Document Name Type of Information File Size
19/07/2022 GO Bus Platform Relocation Project at Scarborough Town Centre July 19 [pdf] 266 KB

Back to top

SmartTrack St. Clair-Old Weston GO

Date Document Name Type of Information File Size
21/03/2022 St. Clair-Old Weston GO Station - Backgrounder [pdf] 5.35 MB

Back to top

SmartTrack Bloor-Lansdowne GO

Date Document Name Type of Information File Size
21/03/2022 Bloor-Lansdowne GO Station Backgrounder [pdf] 3.20 MB

Back to top

SmartTrack King-Liberty GO

Date Document Name Type of Information File Size
11/07/2022 King-Liberty GO Station: Demolition at 99 Sudbury Street Work to begin July 20 [pdf] 1.22 MB
21/03/2022 King-Liberty GO Station Backgrounder [pdf] 10.5 MB

Back to top

SmartTrack Finch-Kennedy GO

Date Document Name Type of Information File Size
28/07/2022 Utility Relocation Along Finch Ave. E. and the Stouffville GO Rail Corridor - Starting Late August 2022 [pdf] 741 KB
21/03/2022 Finch-Kennedy GO Station Backgrounder [pdf] 5.77 MB
2021 Utility Relocation on Finch Avenue East from Milliken Boulevard to Baylawn Drive - Beginning early May 2022 [pdf] 377 KB
2021 Utility Relocation along Finch Avenue East from Midland Avenue to Milliken, beginning late September 2021 [pdf] 499 KB
2021 Utility Relocation on Finch Avenue East from Wayside Avenue to Brimley Road, beginning mid-September 2021 [pdf] 353 KB

Back to top

Stouffville Line

Date Document Name Type of Information File Size
13/06/2022 Platform Adjustment for Landscaping, Grading and Track Works June 25 [pdf] 251 KB
10/03/2022 Steeles Avenue East Road Closure, April 1 at 8:00 p.m. – April 4 at 6:00 a.m. [pdf] 322 KB
08/02/2022 UPDATED: Staircase Construction on Sheppard Avenue East, February 2022 [pdf] 265 KB
2021 Temporary Pedestrian Crossing and Path Closure for Signal and Utility Relocations [pdf] 249 KB
2021 Steeles Avenue East Road Works Silver Star Boulevard to Midland Avenue Driveway Closure [pdf] 298 KB
2021 Corvette Splash Pad Material Survey [pdf] 375 KB
2021 Steeles Avenue East Road Works South Side - Kennedy Road to Redlea Avenue [pdf] 309 KB
2021 Progress Avenue Road Closure October 8-12, 2021 [pdf] 668 KB
2021 GO Expansion: Markham [pdf] 491 KB
2021 GO Expansion: Stouffville [pdf] 2.95 MB
2021 Steeles Avenue East Road Works at Midland Avenue September 20, 2021 [pdf] 146 KB
2021 Signal Conduit Work Under the Sheppard Avenue East Rail Bridge, May 25, 2021 [pdf] 466 KB
2021 Steeles Avenue East Road Works Kennedy Road to Redlea Avenue, May 3, 2021 [pdf] 725 KB
2021 Steeles Avenue East Weekend Closure Between Redlea Avenue and Midland Avenue, April 30 – May 3, 2021 [pdf] 745 KB
2021 Pedestrian Route Update March 29 – Summer 2021 [pdf] 512 KB
2020 Overnight Track and Signal Work February to March 2020 [pdf] 102 KB
2020 Toronto East Region GO Expansion Project: Stouffville Steeles Avenue East Weekend Closure & Temporary Detour Road (Between Redlea Avenue and Old Kennedy Road/Silver Star Boulevard), starting May 29, 2020 [pdf] 546 KB
2020 Reidmount Avenue Noise Wall Construction Update Starting February 14, 2020 [pdf] 127 KB
2020 Pedestrian Crossing Gate Arm Installation at Havendale Rd. & Huntingwood Dr. February to March 2020 [pdf] 125 KB
2020 Temporary Staircase Closure & Sheppard Avenue East North Sidewalk Closure - January 20, 2020 to April 2020 [pdf] 303 KB
2020 Pedestrian Maze Barrier Installation, Stouffville Corridor - January 20, 2020 to Mid-February 2020 [pdf] 214 KB
2019 Temporary Lane Reductions to Pacific Mall/Steeles Avenue East Entrance - Timing: November 3, 2019 [pdf] 203 KB
2019 Stouffville Stations RER Project Steeles Avenue East Underpass Weekend Closure of Steeles Ave (May 24, 2019 to May 27, 2019) - Information as of May 2019 [pdf] 484 KB
2019 Stouffville Stations RER Project Steeles Avenue East Underpass Project Update - Information as of March 2019 [pdf] 2.4 MB
2019 Upcoming Fence Tie-In Work / Tree Planting & Landscaping (Spring 2019) [pdf] 44 KB
2019 Noise Wall EA and TPAP Executive Summary - September, 2019 [pdf] 2 MB
2019 Stouffville RER Stations Project Agincourt Village Community Association Noise Wall Meeting - June 25, 2019 [pdf] 184 KB
2018 Night-time work on West-side of corridor between Huntingwood and Finch beginning September 5th [pdf] 82 KB
2018 Temporary Road Closure at Havendale Rd.- Agincourt Dr. to Belgreen Ave.- July 7th,13th & 20th [pdf] 204 KB
2018 Overnight work from October 30 to November 30 Between Marilyn Avenue to Finch Avenue (work to be done in segments) [pdf] 78 KB
2018 Geotechnical Overnight Work Until October 19th at Proposed Lawrence-Kennedy Station [pdf] 121 KB
2018 Late Night Sewer Work October 14th - 19th [pdf] 144 KB
2018 Dust Mitigation / Upcoming Overnight Work [pdf] 43 KB
2018 Stouffville Stations RER Project Agincourt GO Station Intermittent Nighttime Work (November 15 - 30, 2018) [pdf] 52 KB
2018 Temporary Road Closure at Main Street in Stouffville - Weekend of September 14 [pdf] 100 KB
2018 Upcoming Overnight work near Mount Joy Station on November 12th to 30th [pdf] 179 KB
2018 Lincolnville GO Station Public Meeting - September 13, 2018 [pdf] 1.7 MB
2017 GO Rail Network Electrification TPAP Final Noise/Vibration Modelling Report - September, 2017 [pdf] 80.5 MB
2014 Stouffville Corridor Rail Service Expansion Environmental Study Report Volume 2 - July, 2014 [pdf] 159.3 MB

Back to top

Union Station

Date Document Name Type of Information File Size
25/07/2022 Track Slab Demolition July 2022 – Early 2023 [pdf] 178 KB
12/07/2022 Overnight Work: Construction of Site Access Road near Bremner Blvd. July 11-15 and 18-22 [pdf] 269 KB
10/06/2022 Overnight Rail Tie Replacement and Tamping Work: Jarvis Street - Parliament Street: June 2022 [pdf] 462 KB
08/06/2022 Union Station Enhancement Project - Project Background [pdf] 251 KB
08/04/2022 Weekend Rail Closure: Conduit and Cable Containment April 22-24, 2022 [pdf] 353 KB
07/04/2022 Union Station East Rail Corridor 2022 Construction Season [pdf] 1.9 MB
01/04/2022 Overnight Rail Tie Replacement and Tamping Work at Sherbourne Street: April 4-10, 2022 [pdf] 251 KB
27/01/2022 Cable Pulling and Containment: Weekend Nighttime Work January 28-30, 2022 [pdf] 291 KB
19/01/2022 Construction Activities - Jarvis Street to Sherbourne Street, South Corridor beginning January 24, 2022 [pdf] 417 KB
2021 Upcoming Signal Bridge Caisson installation work November 12-14, 2021 [pdf] 346 KB
2021 Upcoming Signal Bridge Caisson installation work September 17-19, 2021 [pdf] 348 KB
2021 Overnight Signal Bridge Work Weekend of September 3-6, 2021 [pdf] 270 KB
2021 Vegetation and Tree Clearing [pdf] 251 KB
2021 Continuous Signal Bridge and Cabling Work Weekend [pdf] 309 KB
2021 Signal Bridge Demolition and Cabling Work Weekend [pdf] 270 KB
2021 Continuous Cable Installation and Containment Work Weekend [pdf] 348 KB
2021 Track Rail Panel Replacement: Cherry Street to Parliament Street [pdf] 271 KB
2021 Construction Between Sherbourne and Cherry Streets Beginning May 28 [pdf] 419 KB
2021 Union Station East Rail Corridor 2021 Construction Season [pdf] 1.79 MB
2021 USRC - Signal Project Cable Installation between York and Peter Street [pdf] 772 KB
2021 USRC - Signal Project Cable Installation: 55 Hour Work Weekends Continue [pdf] 627 KB
2021 USRC - Cable Pulling and Containment: Continuous Weekend Work beginning January 22, 2021 [pdf] 315 KB
2020 USRC - East Track Enhancement: Pole/foundation removal at Lower Jarvis St NEW REVISED DATE: December 7-11, 2020 (night) [pdf] 325 KB
2020 USRC - Wilson Yard Subsurfacing & Uitility Investigation Jarvis to Cherry Sts November 30 - December 4, 2020 (night) [pdf] 403 KB
2020 USRC - Signal/Communications Upgrade Cable Installation and Containment Early Works Scott Street to Cherry Street November 23 - 30, 2020 (night) [pdf] 401 KB
2020 USRC - East Track Enhancement: Pole/foundation removal at Lower Jarvis St NEW REVISED DATE: November 2-6, 2020 (night) [pdf] 403 KB
2020 Union Station East Rail Corridor 2020 Construction Season [pdf] 1.2 MB
2017 Public Meeting #1 Notice of Commencement [pdf] 136 KB
2017 Public Meeting #1 Story Boards [pdf] 16.1 MB
2017 Public Meeting #1 Presentation [pdf] 3.6 MB
2017 Public Meeting #1 Roll Plans [pdf] 18.2 MB
2017 Public Meeting #1 Summary Report [pdf] 78 MB
2017 Train Shed Revitalization Fact Sheet [pdf] 143 KB

Back to top

Yonge North Subway Extension

Date Document Name Type of Information File Size
2021 Early Works – Geotechnical Field Investigations in Your Community (September) [pdf] 93 KB
2021 Early Works – Geotechnical Field Investigations in Your Community (July) [pdf] 116 KB
2021 Early Works – Geotechnical Field Investigation in Your Community [pdf] 95.6 KB
2021 Environmental assessment studies to begin in your area - Royal Orchard community [pdf] 170 KB
2021 Environmental assessment studies to begin in your area [pdf] 121 KB
2021 Early Works – Utility Scans and Noise Monitoring in Your Community [pdf] 109 KB

Back to top

Durham Region

Date Document Name Type of Information File Size
01/02/2022 Update Rail Corridor Vegetation and Tree Clearing, February 2022 [pdf] 277 KB
2021 Temporary Laydown Area at Rouge Hill GO, November 2021 [pdf] 349 KB
2021 Notice: Rouge River Bridge Rehabilitation, October/November 2021 [pdf] 371 KB
2021 Notice: Rouge River Bridge Rehabilitation [pdf] 1.87 MB
2021 Notice: Rail Corridor Vegetation and Tree Clearing [pdf] 302 KB

Back to top

Guelph & Wellington

Date Document Name Type of Information File Size
16/05/2022 Road Closure: Wilson St. between Carden St. and Gordon St. [pdf] 220 KB
03/05/2022 Guelph Central GO Station South Platform Construction [pdf] 208 KB
22/04/2022 Eramosa River Bridge Replacement [pdf] 154 KB
11/02/2022 Maintenance Work Between Dublin Street and Wyndham Street [pdf] 123 KB
03/02/2022 Vegetation and Tree Clearing [pdf] 94.5 KB
2021 Maintenance Work Between Dublin Street and Wyndham Street [pdf] 133 KB
2021 GO Train Speed Increases [pdf] 117 KB
2021 Kitchener Rail Corridor Maintenance August – September: Rockwood to Kitchener [pdf] 292 KB
2021 Kitchener Rail Corridor Maintenance July - August: Georgetown to Rockwood [pdf] 318 KB
2021 Level Crossing Improvements, Watson Road, Guelph [pdf] 70.4 KB
2021 Speed River Bridge Rehabilitation [pdf] 330 KB
2021 Upcoming Train Speed Testing [pdf] 287 KB
2021 Rail Bridge Rehabilitation [pdf] 338 KB
2021 Upcoming Trenching Work [pdf] 581 KB

Back to top

Peel Region

Date Document Name Type of Information File Size
2022 Your Peel Newsletter – April 13, 2022 [webpage]
2022 Your Peel Newsletter – March 24, 2022 [webpage]
2022 Your Peel Newsletter – March 11, 2022 [webpage]
2022 Your Peel Newsletter – February 23, 2022 [webpage]
2022 Your Peel Newsletter – February 14, 2022 [webpage]
2021 Your Peel Newsletter – December 10, 2021 [webpage]
2021 Your Peel Newsletter – November 15, 2021 [webpage]
2021 Your Peel Newsletter – November 4, 2021 [webpage]
2021 Your Peel Newsletter – October 20, 2021 [webpage]
2021 Your Peel Newsletter – September 16, 2021 [webpage]
2021 Your Peel Newsletter – September 2, 2021 [webpage]
2021 Your Peel Newsletter – August 19, 2021 [webpage]
2021 Your Peel Newsletter – August 5, 2021 [webpage]
2021 Your Peel Newsletter – July 23, 2021 [webpage]
2021 Reminder: Any Time is Train Time [pdf] 146 KB
2021 Elevator closures at Streetsville GO [pdf] 917 KB
2021 Tree Replacement, Erin Mills Transitway Station [pdf] 176 KB
2021 Your Peel Newsletter – July 8, 2021 [webpage]
2021 Your Peel Newsletter – June 24, 2021 [webpage]
2021 Your Peel Newsletter – June 11, 2021 [webpage]
2021 Your Peel Newsletter – May 27, 2021 [webpage]
2021 Your Peel Newsletter – May 13, 2021 [webpage]
2021 Your Peel Newsletter – April 22, 2021 [webpage]
2021 Your Peel Newsletter – April 8, 2021 [webpage]
2021 Your Peel Newsletter – March 25, 2021 [webpage]
2021 Your Peel Newsletter – March 11, 2021 [webpage]
2021 Your Peel Newsletter – February 25, 2021 [webpage]
2021 Your Peel Newsletter – February 11, 2021 [webpage]
2021 Your Peel Newsletter – January 28, 2021 [webpage]
2021 Your Peel Newsletter – January 14, 2021 [webpage]
2020 Your Peel Newsletter – December 2020 [webpage]
2020 Your Peel Newsletter – November 10-26 [webpage]
2020 Special Edition – Cooksville GO Official Opening Day – November 10, 2020 [webpage]
2020 Your Peel Newsletter – October 16-29, 2020 [webpage]
2020 Your Peel Newsletter – October 1 – 15, 2020 [webpage]
2020 Peel E-News: September 29th 2020 [webpage]
2020 Peel E-News: September 10th 2020 [webpage]
2020 Peel E-News: August 2020 [webpage]
2020 Peel E-News: July 2020 [webpage]
2020 Peel E-News: June 2020 [webpage]
2020 Peel E-News: May 2020 [webpage]
2020 Peel E-News: April 2020 [webpage]

Back to top

Simcoe Region

Date Document Name Type of Information File Size
2021 GO Expansion: Simcoe County [pdf] 3.28 MB
2020 Simcoe County Community Presentation – November 2020 [pdf] 2.45 MB

Back to top

Toronto

Date Document Name Type of Information File Size
2021 Don Valley Layover Fact Sheet [pdf] 1.45 MB
2021 GO Expansion in Toronto - Backgrounder [pdf] 373 KB
2021 Bus Rapid Transit to Support Your Growing Community [pdf] 406 KB

Back to top

Waterloo Region

Date Document Name Type of Information File Size
06/07/2022 Signal Commissioning at St. Leger St. Crossing [pdf] 296 KB
03/02/2022 Vegetation and Tree Clearing [pdf] 94.5 KB

Back to top