Rendering image of the platform area of the future High Tech Station.

Yonge North Subway Extension

Extending Line 1 subway service nearly 8 km north from Finch Station to Richmond Hill.

Emergency exit buildings

A total of six emergency exit buildings (EEBs) will be built as part of the Yonge North Subway Extension to support safe subway operations.

The EEBs will be located between the underground stations and are a standard safety feature of modern underground transit lines. In the unlikely event of an emergency, they provide a safe way to reach the surface and allow first responders to quickly access the tunnels.

There's more to an emergency exit building than what can be seen at street level. Construction usually starts by digging down to the subway tunnels to build the underground part of the exit route. The surface-level portion is built later and can be a small, standalone structure or incorporated into an existing building, depending on the location and design.

Our approach to designing the EEBs will be to make sure they blend in as much as possible with the surrounding area.

Locations have been confirmed for three of the emergency exit buildings, between the future tunnel portal and Clark Station. Work is underway to finalize the locations of the three remaining EEBs.

Kirk Drive

The northernmost emergency exit building along the Yonge North Subway Extension will be located in Markham along Kirk Drive, south of the future tunnel portal.

A rendering of the proposed emergency exit building along Kirk Drive.

The proposed emergency exit building along Kirk Drive as viewed from the street.

Construction timeline

  • Site clearing

    In progress

  • Piling and foundation work

    >

  • Excavation

    >

  • Construction of underground structure

    >

  • Construction of surface-level structure

    >

  • Restoration of surrounding area

    >

Local construction

Click the icons on the map for the latest construction notices and other related information.

Community updates

Inverlochy Boulevard

This emergency exit building will be located north of the future Royal Orchard Station, on the northeast corner of a property on Inverlochy Boulevard that faces Bay Thorn Drive.

A rendering of the proposed Inverlochy Boulevard emergency exit building.

The proposed Inverlochy Boulevard emergency exit building as viewed from Bay Thorn Drive, looking east.

A rendering of the proposed Inverlochy Boulevard emergency exit building.

The proposed Inverlochy Boulevard emergency exit building as viewed from Bay Thorn Drive, looking southwest.

Construction timeline

  • Planning and design

    In progress

  • Site clearing

    >

  • Piling and foundation work

    >

  • Excavation

    >

  • Construction of underground structure

    >

  • Construction of surface-level structure

    >

  • Restoration of surrounding area

    >

Local construction

Click the icons on the map for the latest construction notices and other related information.

Community updates

Yonge Street, south of John Street

This emergency exit building will be located along Yonge Street, south of John Street. Work to prepare for construction started in March 2026.

A rendering of the proposed emergency exit building along Yonge Street, south of John Street.

The proposed emergency exit building along Yonge Street, south of John Street.

A rendering of the proposed emergency exit building along Yonge Street, south of John Street.

The proposed emergency exit building along Yonge Street, south of John Street.

Construction timeline

  • Mobilization and site clearing

    April 2026

  • Road widening

    July 2026

  • Preparing site for major construction

    In progress

  • Piling and foundation work

    >

  • Excavation

    >

  • Construction of underground structure

    >

  • Construction of surface-level structure

    >

  • Restoration of surrounding area

    >

Local construction

Click the icons on the map for the latest construction notices and other related information.

Community updates

Get in touch

We're committed to keeping you informed and engaged every step of the way as we build the Yonge North Subway Extension.

Our team is here to answer your questions, address issues, and provide the information you need. Reach out to us any time at YongeSubwayExt@metrolinx.com or 416-202-7000.

You can also book a meeting with us online or at our community office in York Region.