Scarborough Subway Extension

Extending Line 2 subway service 7.8 km farther into the heart of Scarborough.

Kennedy Station

As the current terminus of the TTC's Line 2, Kennedy Station is being upgraded to allow for the extension of Line 2 subway service.

The station site has been reoriented for a temporary bus loop and new auxiliary buildings, and work is ongoing to expand the station’s existing service rooms, safety and security systems, integrate the new power system and build the Kennedy Box Structure (KBS) - an underground structure connecting the existing Kennedy station with the extension’s tunnel boring machine extraction shaft at Eglinton Avenue East and Midland Avenue.

Images

Kennedy Station

Aerial view of ongoing work at Kennedy Station to extend Line 2 subway service.

Kennedy Box Structure

Illustrative map of the Kennedy Box Structure and work zone.

Construction timeline

  • Site clearing

    February 2024

  • Auxiliary building construction begins

    March 2024

  • Early works, auxiliary building construction and Kennedy Box Structure piling

    Current

  • Excavation

    Next

Local construction

Click the icons on the map for the latest notices and other information related to the station.

Get in touch

We're committed to keeping you informed and engaged every step of the way as we build the Scarborough Subway Extension.

Our team is here to answer your questions, address issues, and provide the information you need. Reach out to us any time at ScarboroughSubwayExtension@metrolinx.com or via our 24/7 phone line: 416-202-7900.