Eglinton Crosstown LRT update – Leaside gets name in bold
Metrolinx News has the latest photos from the transit building along the Crosstown LRT route.
Apr 14, 2022
Laird Station has passed another stepping stone on the way to completion. The interlocking bricks at the secondary entrance have been completely installed. (Metrolinx image)
Work on the future sidewalk at Chaplin Station is underway. The crew is pouring concrete for curbs on the south side of Eglinton Avenue that will form the structure of the sidewalk. (Metrolinx image)
by Scott Money Metrolinx editorial content manager