Future OL Queen Station - hero image

Ontario Line

A new 15.6-km subway line in Toronto that will run from Exhibition Place, through downtown, all the way to Line 5 Eglinton at Don Mills Road.

Opening of construction gate at Gertrude Place

Expected Duration

Sep 28, 2026 - Sep 29, 2028

Working Hours

Monday to Sunday, 24 hours

Date of Notice

Sep 23, 2026

Map showing location of gate

What is Happening?

Work on the installation of a 7-meter-high sound wall for the newly reconfigured Gertrude gate has been completed. The gate is now ready for use as an egress gate to support Pape SOE excavation, TTC Box underpinning, and future station works. 

Operations of the gate will begin as early as Monday, September 28.  To support reconfiguration, the sidewalks at Muriel Avenue and Gertrude Place have been fully restored to improve accessibility.

What to expect

  • Increased presence of construction vehicles and equipment can be expected in the work area.
  • Work areas will be clearly marked or fenced off to ensure public safety.
  • Please exercise caution around active construction sites.
  • Work may be delayed or rescheduled due to weather or unforeseen circumstances.
  • Mud mats and a wheel wash system are installed to prevent debris from being tracked onto public roads.

Traffic Changes

  • No disruptions to traffic are anticipated.

Pedestrian Access

  • Temporary sidewalk closures or pedestrian detours will be in place while the work is underway, with signs in place to direct pedestrians as needed.

Noise and Vibration

  • Residences and businesses in the area may experience noise and vibration caused by construction equipment related to this work.

Transit Service

  • There is no anticipated impact to transit services.

Connect With Us

Contact Info

Visit Us

  • 45 Overlea Blvd., Toronto, ON

  • 770 Queen St. E., Toronto, ON

  • 810 Danforth Ave., Toronto, ON