County Court sidewalk

Hazel McCallion Line

Providing 18km of light rail transit from Port Credit GO to Brampton Gateway Terminal.

Temporary Turn Restrictions at Hurontario and Eaglewood

Expected Duration

Nov 11, 2026 - Nov 16, 2026

Working Hours

Wednesday to Monday, 24 hours

Date of Notice

Nov 5, 2026

Map showing turn restrictions at Eaglewood and Hurontario Street

What is Happening?

Crews will install new sanitary infrastructure at Eaglewood Boulevard and Hurontario Street, followed by road milling and paving. From November 11 to 16, 2026, temporary traffic restrictions will be in place, including left-turn restrictions, lane shifts and overnight closures at Eaglewood Boulevard. Additional restrictions will be in place from November 14 to 16, with detours available via Mineola Road, Eaglewood Boulevard and Inglewood Drive. A flagging person will direct traffic through a single-lane (northbound and southbound) alternating configuration on Hurontario Street on November 13-15. Emergency access will be maintained throughout the work 

What to expect

  • Where possible, lights from equipment will be positioned away from residential homes to keep light pollution levels low.
  • Crews will take precautions to monitor and reduce dust.
  • The driveway on Hurontario that provides access to plaza's north of Eaglewood Blvd will be closed for the duration of the work.
  • Increased presence of construction vehicles and equipment can be expected in the work area.
  • Work areas will be clearly marked or fenced off to ensure public safety.
  • Please exercise caution around active construction sites.
  • Work may be delayed or rescheduled due to weather or unforeseen circumstances.

Traffic Changes

  • Minor delays may be experienced near the work zone.
  • A paid duty officer, flaggers and detour signs will be onsite to direct traffic as needed.
  • All businesses in the area will remain open during the work. Please follow signage for access.

Pedestrian Access

  • Temporary sidewalk closures or pedestrian detours will be in place while the work is underway, with signs in place to direct pedestrians as needed.
  • Pedestrian detours may be required, with signs in place to direct pedestrians as needed.
  • Clear and defined walking paths will be maintained during construction to ensure pedestrian safety.

Noise and Vibration

  • Residences and businesses in the area may experience noise and vibration caused by construction equipment related to this work.
  • Crews will take measures to minimize disruptions to the surrounding area wherever possible.
  • Residences and businesses in the area can expect noise and vibration caused by construction equipment related to this work.

Transit Service

  • Please visit Miway.ca/updates for more information about changes to your travel.

Connect With Us

Contact Info

Visit Us

3024 Hurontario St, Unit G12, Mississauga, ON