On the weekend of May 22 to 25, the Petrucco rail bridge on track 3 will be removed. On the following weekend, May 29 to June 01, the Petrucco rail bridges on track 1 and 2 will be removed. This work will take in the daytime and at night. The tracks sitting atop the Petrucco bridges will be cut and removed. A crane will be used to hoist each portion of the bridges out of the corridor. Once all pieces of the bridge are removed, the area will be backfilled and new, pre-built tracks will be placed. During this time, Long Branch GO Station will be closed. We apologize for any inconvenience this may cause and appreciate your patience as we take this important step toward building the new station.