Expected Duration

Jul 1, 2026 - Aug 28, 2026

Working Hours

Monday to Friday, 7:00 a.m. to 5:00 p.m.

Date of Notice

Jun 24, 2026

Location and layout of the Galloway Road worksite

What is Happening?

We will be setting up our main site to support the construction of the Galloway Road grade separation in the area shown on the map. The site will have stores, workshops and worker welfare facilities. As we set up the site we will also be clearing and grubbing, which means that we'll be removing all vegetation from the area. We will also need to compact and prepare the ground so that vehicles can drive onto the site for deliveries. In the north east part of the site we will need to make some changes to the existing gas main but this is not expected to impact any nearby properties.

What to expect

  • Construction lighting may be visible from the work site.
  • Trucks and construction equipment may generate dust during construction.
  • Increased presence of construction vehicles and equipment can be expected in the work area.
  • Work areas will be clearly marked or fenced off to ensure public safety.
  • Please exercise caution around active construction sites.

Traffic Changes

  • No disruptions to traffic are anticipated.

Pedestrian Access

  • Temporary sidewalk closures or pedestrian detours will be in place while the work is underway, with signs in place to direct pedestrians as needed.

Noise and Vibration

  • Crews will take measures to minimize disruptions to the surrounding area wherever possible.
  • Residences and businesses in the area can expect noise and vibration caused by construction equipment related to this work.

Transit Service

  • There is no anticipated impact to transit services.