2021 |
Errata to Environmental Project Report Addendum |
[pdf] |
5.17 MB |
2021 |
Environmental Project Report Addendum Executive Summary |
[pdf] |
1.27 MB |
2021 |
Environmental Project Report Addendum |
[pdf] |
74.14 MB |
2021 |
Appendix A: Natural Environment Impact Assessment Report |
[pdf] |
17.07 MB |
2021 |
Appendix B: Preliminary Environmental Site Assessment (ESA) Technical Memorandum (prepared for New Track & Facilities TPAP Layover and Storage Facilities) |
[pdf] |
4.91 MB |
2021 |
Appendix C1: Cultural Heritage Technical Memorandum |
[pdf] |
34.36 MB |
2021 |
Appendix C2: Cultural Heritage Report: Existing Conditions and Preliminary Impact Assessment Union Station Rail Corridor (USRC) Hydro One Conflict Areas |
[pdf] |
5.35 MB |
2021 |
Appendix C3: Heritage Impact Assessment: Lower Sherbourne Street USRC Bridge |
[pdf] |
3.92 MB |
2021 |
Appendix C4: Heritage Impact Assessment: Parliament Street USRC Bridge |
[pdf] |
4.32 MB |
2021 |
Appendix C5: Heritage Impact Assessment: Cherry Street USRC Bridge |
[pdf] |
4.21 MB |
2021 |
Appendix D: Archaeological Assessment Report (Prepared for New Track & Facilities TPAP) |
[pdf] |
29.55 MB |
2021 |
Appendix E: Land Use and Socio-Economic Impact Assessment Report |
[pdf] |
5.69 MB |
2021 |
Appendix F1: Regional Air Quality Study Report |
[pdf] |
2.06 MB |
2021 |
Appendix F2: USRC Air Quality Study Report |
[pdf] |
8.89 MB |
2021 |
Appendix F3: Kitchener Air Quality Study Report |
[pdf] |
7.28 MB |
2021 |
Appendix G1: USRC Impact Assessment Report |
[pdf] |
13.21 MB |
2021 |
Appendix G2: Lakeshore West Impact Assessment Report |
[pdf] |
61.53 MB |
2021 |
Appendix G3: Kitchener Impact Assessment Report |
[pdf] |
12.72 MB |
2021 |
Appendix G4: Barrie Impact Assessment Report |
[pdf] |
69.07 MB |
2021 |
Appendix G5: Stouffville Impact Assessment Report |
[pdf] |
46.65 MB |
2021 |
Appendix G6: Lakeshore East Impact Assessment Report |
[pdf] |
80.07 MB |
2021 |
Appendix I: Utilities Impact Assessment Report Part 1 of 2 (Prepared for New Track & Facilities TPAP Layover and Storage Facilities) |
[pdf] |
54.72 MB |
2021 |
Appendix I: Utilities Impact Assessment Report Part 2 of 2 (Prepared for New Track & Facilities TPAP Layover and Storage Facilities) |
[pdf] |
33.62 MB |
2021 |
Appendix J: Electromagnetic Interference/Electromagnetic Fields (EMI/EMF) Impact Assessment Report |
[pdf] |
27.86 MB |
2021 |
Appendix K: Preliminary Stormwater Management Reports (Prepared for New Track & Facilities TPAP Layover and Storage Facilities) |
[pdf] |
47.2 MB |
2021 |
Appendix L: Hydrogeological Impact Assessment Study - Part 1 of 4 |
[pdf] |
52.3 MB |
2021 |
Appendix L: Hydrogeological Impact Assessment Study - Part 2 of 4 |
[pdf] |
49.71 MB |
2021 |
Appendix L: Hydrogeological Impact Assessment Study - Part 3 of 4 |
[pdf] |
58.07 MB |
2021 |
Appendix L: Hydrogeological Impact Assessment Study - Part 4 of 4 |
[pdf] |
45.74 MB |
2021 |
Appendix M1: Master Contact List |
[pdf] |
2.49 MB |
2021 |
Appendix M2: Public Notices and Newspaper Ads |
[pdf] |
12.84 MB |
2021 |
Appendix M3: Stakeholder Notification and Correspondence |
[pdf] |
6.57 MB |
2021 |
Appendix M4: PIC 1 Summary Report Part 1 of 4 |
[pdf] |
28.37 MB |
2021 |
Appendix M4: PIC 1 Summary Report Part 2 of 4 |
[pdf] |
17.33 MB |
2021 |
Appendix M4: PIC 1 Summary Report Part 3 of 4 |
[pdf] |
69.81 MB |
2021 |
Appendix M4: PIC 1 Summary Report Part 4 of 4 |
[pdf] |
31.83 MB |
2021 |
Appendix M5: PIC 2 Summary Report Part 1 of 8 |
[pdf] |
5.51 MB |
2021 |
Appendix M5: PIC 2 Summary Report Part 2 of 8 |
[pdf] |
22.74 MB |
2021 |
Appendix M5: PIC 2 Summary Report Part 3 of 8 |
[pdf] |
1.38 MB |
2021 |
Appendix M5: PIC 2 Summary Report Part 4 of 8 |
[pdf] |
50.22 MB |
2021 |
Appendix M5: PIC 2 Summary Report Part 5 of 8 |
[pdf] |
54.26 MB |
2021 |
Appendix M5: PIC 2 Summary Report Part 6 of 8 |
[pdf] |
52.41 MB |
2021 |
Appendix M5: PIC 2 Summary Report Part 7 of 8 |
[pdf] |
44.32 MB |
2021 |
Appendix M5: PIC 2 Summary Report Part 8 of 8 |
[pdf] |
766.25 MB |
2021 |
Appendix M6: PIC 3 Summary Report Part 1 of 2 |
[pdf] |
23.63 MB |
2021 |
Appendix M6: PIC 3 Summary Report Part 2 of 2 |
[pdf] |
31.52 MB |
2021 |
Appendix M7: Public Correspondence |
[pdf] |
13.41 MB |
2021 |
Appendix M8: Indigenous Correspondence Part 1 of 2 |
[pdf] |
47.15 MB |
2021 |
Appendix M8: Indigenous Correspondence Part 2 of 2 |
[pdf] |
40.33 MB |
2021 |
Appendix M9: Municipal Correspondence Part 1 of 8 |
[pdf] |
33.12 MB |
2021 |
Appendix M9: Municipal Correspondence Part 2 of 8 |
[pdf] |
40.33 MB |
2021 |
Appendix M9: Municipal Correspondence Part 3 of 8 |
[pdf] |
50.85 MB |
2021 |
Appendix M9: Municipal Correspondence Part 4 of 8 |
[pdf] |
32.61 MB |
2021 |
Appendix M9: Municipal Correspondence Part 5 of 8 |
[pdf] |
44.27 MB |
2021 |
Appendix M9: Municipal Correspondence Part 6 of 8 |
[pdf] |
52.4 MB |
2021 |
Appendix M9: Municipal Correspondence Part 7 of 8 |
[pdf] |
53.38 MB |
2021 |
Appendix M9: Municipal Correspondence Part 8 of 8 |
[pdf] |
43.22 MB |
2021 |
Appendix M10: Agency Correspondence Part 1 of 4 |
[pdf] |
56.87 MB |
2021 |
Appendix M10: Agency Correspondence Part 2 of 4 |
[pdf] |
30.85 MB |
2021 |
Appendix M10: Agency Correspondence Part 3 of 4 |
[pdf] |
17.46 MB |
2021 |
Appendix M10: Agency Correspondence Part 4 of 4 |
[pdf] |
36.59 MB |
2021 |
Appendix M11: Other Stakeholder Correspondence Part 1 of 4 |
[pdf] |
36.06 MB |
2021 |
Appendix M11: Other Stakeholder Correspondence Part 2 of 4 |
[pdf] |
52.55 MB |
2021 |
Appendix M11: Other Stakeholder Correspondence Part 3 of 4 |
[pdf] |
23.82 MB |
2021 |
Appendix M11: Other Stakeholder Correspondence Part 4 of 4 |
[pdf] |
57.87 MB |
2021 |
Appendix M12: Don Fleet Junction Update |
[pdf] |
3.24 MB |
2021 |
Appendix N1: Conceptual Electrification Corridor Plans_Union Station Rail Corridor |
[pdf] |
4.01 MB |
2021 |
Appendix N2: Conceptual Electrification Corridor Plans_Lakeshore West |
[pdf] |
6.11 MB |
2021 |
Appendix N3: Conceptual Electrification Corridor Plans_Kitchener |
[pdf] |
12.12 MB |
2021 |
Appendix N4: Conceptual Electrification Corridor Plans_Barrie |
[pdf] |
4.89 MB |
2021 |
Appendix N5: Conceptual Electrification Corridor Plans_Stouffville |
[pdf] |
3.52 MB |
2021 |
Appendix N6: Conceptual Electrification Corridor Plans_Lakeshore East |
[pdf] |
6.98 MB |
2021 |
Appendix O1: Noise/Vibration Receptors and Mitigation Measures_Union Station Rail Corridor |
[pdf] |
5.27 MB |
2021 |
Appendix O2: Noise/Vibration Receptors and Mitigation Measures_Lakeshore West |
[pdf] |
57.06 MB |
2021 |
Appendix O3: Noise/Vibration Receptors and Mitigation Measures_Kitchener |
[pdf] |
12.46 MB |
2021 |
Appendix O4: Noise/Vibration Receptors and Mitigation Measures_Barrie Part 1 of 2 |
[pdf] |
48.79 MB |
2021 |
Appendix O4: Noise/Vibration Receptors and Mitigation Measures_Barrie Part 2 of 2 |
[pdf] |
37.02 MB |
2021 |
Appendix O5: Noise/Vibration Receptors and Mitigation Measures_Stouffville |
[pdf] |
37.56 MB |
2021 |
Appendix O6: Noise/Vibration Receptors and Mitigation Measures_Lakeshore East |
[pdf] |
56.59 MB |
2021 |
Appendix P: List of Technical Reports and Studies Reviewed |
[pdf] |
206.11 KB |
2017 |
Class Environment Assessment For Minor Transmission Facilities |
[pdf] |
1.9 MB |
2017 |
GO Transit Hydrogen Feasibility Study |
[pdf] |
181 KB |
2017 |
Volume 1 |
[pdf] |
25.14 MB |
2017 |
Volume 2 |
[pdf] |
49.31 MB |
2017 |
Volume 3 |
[pdf] |
38.75 MB |
2017 |
Volume 4 |
[pdf] |
7.26 MB |
2017 |
Volume 5 |
[pdf] |
3.35 MB |
2017 |
Errata Document |
[pdf] |
1.69 MB |
2017 |
Appendix A1 Natural Env Baseline Conditions Report |
[pdf] |
97.87 MB |
2017 |
Appendix A2 Natural Env Impact Assessment Report |
[pdf] |
112.74 MB |
2017 |
Appendix B - Preliminary ESA Gap Analysis Report |
[pdf] |
3.39 MB |
2017 |
Appendix B - Preliminary Environmental Site Assessment (ESA) Reports - Traction Power Facilities & Feeder Routes |
[pdf] |
19.12 MB |
2017 |
Appendix C1 Cultural Heritage Screening Report |
[pdf] |
115 MB |
2017 |
Appendix C2 Cultural Heritage Impact Assessment Report |
[pdf] |
120.97 MB |
2017 |
Appendix D1 Archaeology Baseline Conditions Report |
[pdf] |
25.64 MB |
2017 |
Appendix D2 Stage 1 Archaeology Assessment Report |
[pdf] |
57.7 MB |
2017 |
Appendix E1 Land Use Socio-Ec Baseline Report |
[pdf] |
54.89 MB |
2017 |
Appendix E2 Land Use Socio-Ec Impact Assessment Report |
[pdf] |
54.23 MB |
2017 |
Appendix F1 Air Quality Baseline Report |
[pdf] |
27.25 MB |
2017 |
Appendix F2 Air Quality Impact Assessment Report |
[pdf] |
3.33 MB |
2017 |
Appendix G1 USRC Noise Vibration Impact Assessment |
[pdf] |
8.26 MB |
2017 |
Appendix G2 LSW Noise Vibration Impact Assessment |
[pdf] |
19.11 MB |
2017 |
Appendix G3 Kitchener Noise Vibration Impact Assessment |
[pdf] |
10.16 MB |
2017 |
Appendix G4 Barrie Noise Vibration Impact Assessment |
[pdf] |
43.41 MB |
2017 |
Appendix G5 Stouffville Noise Vibration Impact Assessment |
[pdf] |
85.59 MB |
2017 |
Appendix G6 LSE Noise Vibration Impact Assessment |
[pdf] |
27.87 MB |
2017 |
Appendix H1 Visual Baseline Report |
[pdf] |
309.4 MB |
2017 |
Appendix H2 Visual Impact Assessment Report |
[pdf] |
373.4 MB |
2017 |
Appendix I1 Utilities Baseline Conditions Report |
[pdf] |
185.54 MB |
2017 |
Appendix I2 Utilities Impact Assessment Report |
[pdf] |
339.66 MB |
2017 |
Appendix J1 EMI EMF Baseline Report |
[pdf] |
9.6 MB |
2017 |
Appendix J2 EMIEMF Impact Assessment Report |
[pdf] |
51.64 MB |
2017 |
Appendix K SWM Assessment Report |
[pdf] |
79.56 MB |
2017 |
Appendix J1 EMI EMF Baseline Report |
[pdf] |
9.6 MB |
2017 |
Appendix L1 - Master Contact List |
[pdf] |
1.12 MB |
2017 |
Appendix L2 - Public Notices and Newspaper Ads |
[pdf] |
88.32 MB |
2017 |
Appendix L3 - Stakeholder Notification & Correspondence |
[pdf] |
23.13 MB |
2017 |
Appendix L4 - Public Meeting Summary Report 1 |
[pdf] |
276.68 MB |
2017 |
Appendix L5 - Public Meeting Summary Report 2 |
[pdf] |
108.77 MB |
2017 |
Appendix L6 - Public Meeting Summary Report 3 |
[pdf] |
60.64 MB |
2017 |
Appendix L7 - Public Correspondence |
[pdf] |
53.5 MB |
2017 |
Appendix L8 - Aboriginal Correspondence |
[pdf] |
102.45 MB |
2017 |
Appendix L9 - Municipal Correspondence |
[pdf] |
280.96 MB |
2017 |
Appendix L10 - Agency Correspondence |
[pdf] |
146.99 MB |
2017 |
Appendix L11 - Other Stakeholder Correspondence |
[pdf] |
47.28 MB |
2017 |
Appendix M1 - 8000 Dixie Road (BramaleaPS) CHER |
[pdf] |
4.21 MB |
2017 |
Appendix M2 - Birchmount Overpass CHER |
[pdf] |
5.16 MB |
2017 |
Appendix M3 - Carlaw Avenue Subway CHER |
[pdf] |
12.44 MB |
2017 |
Appendix M4 - Credit River Bridge CHER |
[pdf] |
4.81 MB |
2017 |
Appendix M5 - Danforth Avenue Subway CHER |
[pdf] |
3.28 MB |
2017 |
Appendix M6 - Don River Bridge CHER |
[pdf] |
3.32 MB |
2017 |
Appendix M7 - Drury Lane CHER |
[pdf] |
10.5 MB |
2017 |
Appendix M8 - Dundas Bridge CHER |
[pdf] |
6.18 MB |
2017 |
Appendix M9 - Eastern Avenue Subway CHER |
[pdf] |
7.99 MB |
2017 |
Appendix M10 - Etobicoke Creek Bridge CHER |
[pdf] |
20.74 MB |
2017 |
Appendix M11 - Gardiner Expressway Overhead CHER |
[pdf] |
7.15 MB |
2017 |
Appendix M12 - Gerrard Street East Subway CHER |
[pdf] |
14.28 MB |
2017 |
Appendix M13 - Holland River Bridge CHER |
[pdf] |
5.18 MB |
2017 |
Appendix M14 - Humber River Bridge (LSW) CHER |
[pdf] |
4.15 MB |
2017 |
Appendix M15 - Innes Ave Bridge CHER |
[pdf] |
5.95 MB |
2017 |
Appendix M16 - Islington Bridge CHER |
[pdf] |
4.46 MB |
2017 |
Appendix M17 - Maple GO Station CHER |
[pdf] |
4.21 MB |
2017 |
Appendix M18 - Markham GO Station CHER |
[pdf] |
4.46 MB |
2017 |
Appendix M19 - Newmarket GO CHER |
[pdf] |
6.24 MB |
2017 |
Appendix M20 - Oakville Bridges CHER |
[pdf] |
12.24 MB |
2017 |
Appendix M21 - Pape Avenue Bridge CHER |
[pdf] |
3.31 MB |
2017 |
Appendix M22 - Sunnyside Ped Bridge CHER |
[pdf] |
7.59 MB |
2017 |
Appendix M23 - Topiary Signs CHER |
[pdf] |
5.24 MB |
2017 |
Appendix M24 - Willowbrook CHER |
[pdf] |
6.33 MB |
2017 |
Appendix M25 - Aurora GO Station HIA |
[pdf] |
2.19 MB |
2017 |
Appendix M26 - Credit River Bridge HIA |
[pdf] |
3.36 MB |
2017 |
Appendix M27 - Union Station HIA |
[pdf] |
8.57 MB |
2017 |
Appendix M28 - Aurora GO Station SCHV |
[pdf] |
1.65 MB |
2017 |
Appendix M29 - Bronte Creek Bridge SCHV |
[pdf] |
256 KB |
2017 |
Appendix M30 - Carlaw Subway SCHV |
[pdf] |
342 KB |
2017 |
Appendix M31 - Credit River Bridge SCHV |
[pdf] |
302 KB |
2017 |
Appendix M32 - Gerrard Subway SCHV |
[pdf] |
310 KB |
2017 |
Appendix M33 - Highland Creek Bridge (LSE) SCHV |
[pdf] |
431 KB |
2017 |
Appendix M34 - Humber River Bridge (LSW) SCHV |
[pdf] |
318 KB |
2017 |
Appendix M35 - Islington Avenue Bridge SCHV |
[pdf] |
325 KB |
2017 |
Appendix M36 - Maple GO Station SCHV |
[pdf] |
260 KB |
2017 |
Appendix M37 - Markham GO Station SCHV |
[pdf] |
305 KB |
2017 |
Appendix M38 - Newmarket GO SCHV |
[pdf] |
356 KB |
2017 |
Appendix M39 - Sixteen Mile Creek Bridge SCHV |
[pdf] |
270 KB |
2017 |
Appendix M40 - Union Station SCHV |
[pdf] |
201 KB |
2017 |
Appendix N1 USRC Concept Elec Plans |
[pdf] |
1.68 MB |
2017 |
Appendix N2 LSW Concept Elec Plans |
[pdf] |
19.99 MB |
2017 |
Appendix N3 Kitchener Concept Elec Plans |
[pdf] |
2.97 MB |
2017 |
Appendix N4 Barrie Concept Elec Plans |
[pdf] |
41 MB |
2017 |
Appendix N5 Stouffville Concept Elec Plans |
[pdf] |
18.3 MB |
2017 |
Appendix N6 LSE Concept Elec Plans |
[pdf] |
18.81 MB |
2017 |
Appendix O Conceptual Traction Power Facility Plans |
[pdf] |
9.91 MB |
2017 |
Appendix P1a USRC ELC Mapping |
[pdf] |
9.4 MB |
2017 |
Appendix P1b LSW ELC Mapping |
[pdf] |
18.97 MB |
2017 |
Appendix P1c Kitchener ELC Mapping |
[pdf] |
17.82 MB |
2017 |
Appendix P1d Barrie ELC Mapping |
[pdf] |
38.56 MB |
2017 |
Appendix P1e Stouffville ELC Mapping |
[pdf] |
15.61 MB |
2017 |
Appendix P1f LSE ELC Mapping |
[pdf] |
17.79 MB |
2017 |
Appendix P2a USRC Terrestrial and Aquatic Maps |
[pdf] |
1.15 MB |
2017 |
Appendix P2b LSW Terrestrial and Aquatic Maps |
[pdf] |
8.29 MB |
2017 |
Appendix P2c Kitchener Terrestrial and Aquatic Maps |
[pdf] |
1.61 MB |
2017 |
Appendix P2d Barrie Terrestrial and Aquatic Maps |
[pdf] |
16.43 MB |
2017 |
Appendix P2e Stouffville Terrestrial and Aquatic Maps |
[pdf] |
10.5 MB |
2017 |
Appendix P2f LSE Terrestrial and Aquatic Maps |
[pdf] |
12.2 MB |
2017 |
Appendix Q Mapping of Cultural Heritage Resources |
[pdf] |
18.4 MB |
2017 |
Appendix R1 USRC LandUse OCSImpactZones |
[pdf] |
1.38 MB |
2017 |
Appendix R2 LSW LandUse OCSImpactZones |
[pdf] |
8.86 MB |
2017 |
Appendix R3 Kitchener LandUse OCSImpactZones |
[pdf] |
1.51 MB |
2017 |
Appendix R4 Barrie LandUse OCSImpactZones |
[pdf] |
14.64 MB |
2017 |
Appendix R5 Stouffville LandUse OCSImpactZones |
[pdf] |
7.51 MB |
2017 |
Appendix R6 LSE LandUse OCSImpactZones |
[pdf] |
7.79 MB |
2017 |
Appendix S1 Mapping of Receptors and Recommended Locations for Noise and Vibration Mitigation (USRC) |
[pdf] |
1.47 MB |
2017 |
Appendix S2 Mapping of Receptors and Recommended Locations for Noise and Vibration Mitigation (LSW) |
[pdf] |
17.68 MB |
2017 |
Appendix S3 Mapping of Receptors and Recommended Locations for Noise and Vibration Mitigation (Kitchener) |
[pdf] |
2.52 MB |
2017 |
Appendix S4 Mapping of Receptors and Recommended Locations for Noise and Vibration Mitigation (Barrie) |
[pdf] |
35.41 MB |
2017 |
Appendix S5 Mapping of Receptors and Recommended Locations for Noise and Vibration Mitigation (Stouffville) |
[pdf] |
21.45 MB |
2017 |
Appendix S6 Mapping of Receptors and Recommended Locations for Noise and Vibration Mitigation (LSE) |
[pdf] |
16.11 MB |
2017 |
Appendix T Mapping of Viewsheds and Potential Visual Impact Areas |
[pdf] |
297.85 MB |
2017 |
Appendix U List of Technical References |
[pdf] |
263 KB |
2017 |
Appendix V - Groundwater Assessment Report |
[pdf] |
72.33 MB |
2014 |
Union-Pearson Express Environmental Assessment Executive Summary |
[pdf] |
481 KB |
2014 |
EPR Table of Contents and Glossary |
[pdf] |
2.3 MB |
2014 |
EPR Chapter 1 – Introduction |
[pdf] |
574 KB |
2014 |
EPR Chapter 2 – Assessment of Facility Locations |
[pdf] |
1.4 MB |
2014 |
EPR Chapter 3 – Scope of the Project |
[pdf] |
880 KB |
2014 |
EPR Chapter 4 – Baseline Conditions |
[pdf] |
1.7 MB |
2014 |
EPR Chapter 5 – Detailed Project Description |
[pdf] |
145.8 MB |
2014 |
EPR Chapter 6 – Impact Assessment & Monitoring |
[pdf] |
3 MB |
2014 |
EPR Chapter 7 – Commitments & Future Work |
[pdf] |
462 KB |
2014 |
EPR Chapter 8 – Consultation |
[pdf] |
1.5 MB |
2014 |
EPR Chapter 9 – Approvals and Permits |
[pdf] |
451 KB |
2014 |
Appendix A - Natural Environment Assessment Report |
[pdf] |
10.9 MB |
2014 |
Appendix B - Land Use Assessment Report |
[pdf] |
2.4 MB |
2014 |
Appendix C - Cultural Heritage Assessment Report |
[pdf] |
18 MB |
2014 |
Appendix D - Stage 1 Archaeological Assessment Report |
[pdf] |
5.4 MB |
2014 |
Appendix E - Air Quality Assessment Report |
[pdf] |
993 KB |
2014 |
Appendix F - Noise and Vibration Assessment Report |
[pdf] |
1.9 MB |
2014 |
Appendix G - Visual Impact Assessment Report |
[pdf] |
1.5 MB |
2014 |
Appendix H - Electromagnetic Compatibility (EMC) Report |
[pdf] |
932 KB |
2014 |
Appendix I - Traffic Report |
[pdf] |
1.5 MB |
2014 |
Appendix J - Consultation Record |
[pdf] |
31.5 B |
2014 |
Appendix K - Utilities Report |
[pdf] |
856 KB |
2014 |
Appendix L - Maintenance Facility Conceptual Design Report |
[pdf] |
1 MB |
2010 |
High Level Decision Making Framework |
[pdf] |
587 KB |
2010 |
Stakeholder Engagement and Communications |
[pdf] |
7 MB |
2010 |
Baseline/Reference Case |
[pdf] |
3.2 MB |
2010 |
Rolling Stock Technology Assessment |
[pdf] |
2.5 MB |
2010 |
Operating Plan for the Reference Case |
[pdf] |
2.5 MB |
2010 |
Electrification Systems Technology Assessment |
[pdf] |
1 MB |
2010 |
Conceptual Design of Electrification System |
[pdf] |
4.6 MB |
2010 |
Approach to Cost Benefit Analysis |
[pdf] |
848 KB |
2010 |
Incremental Capital Cost Estimates |
[pdf] |
624 KB |
2010 |
Incremental Operations and Maintenance Cost Estimates |
[pdf] |
413 KB |
2010 |
Air Quality & Health Impacts |
[pdf] |
1 MB |
2010 |
Noise & Vibration Impacts |
[pdf] |
553 KB |
2010 |
Natural Environmental Impacts |
[pdf] |
426 KB |
2010 |
Social/Community Impacts |
[pdf] |
877 KB |
2010 |
Economic Impacts |
[pdf] |
437 KB |
2010 |
Population and Community Use Analysis |
[pdf] |
904 KB |
2010 |
Risk Assessment |
[pdf] |
454 KB |
2010 |
Multiple Category Evaluation - Findings and Conclusions |
[pdf] |
1.8 MB |
2010 |
Implementation of Electrification Options |
[pdf] |
1.6 MB |