10.0
APPENDICES
ANNEXE E PHOTO CREDITS
S'il vous plaît noter: les numéros de page correspondent à la version imprimée de ce document
MESSAGE FROM THE CHAIR
PREFACE
1.0 INTRODUCTION
- 1.1 The Need to Act: Transforming Transportation
- 1.2 The Greater Toronto and Hamilton Area
- 1.3 GTHA Challenges
- 1.4 Global Challenges
2.0 A VISION FOR THE FUTURE
3.0 GOALS AND OBJECTIVES
4.0 STRATEGIES
- Top Ten Strategies, Nine Big Moves
- Strategy #1 Build a Comprehensive Regional Rapid Transit Network
- Strategy #2 Enhance and Expand Active Transportation
- Strategy #3 Improve the Efficiency of the Road and Highway Network
- Strategy #4 Create an Ambitious Transportation Demand Management Program
- Strategy #5 Create a Customer-First Transportation System
- Strategy #6 Implement an Integrated Transit Fare System
- Strategy #7 Build Communities that are Pedestrian, Cycling and Transit-Supportive
- Strategy #8 Plan for Universal Access
- Strategy #9 Improve Goods Movement Within the GTHA and With Adjacent Regions
- Strategy #10 Commit to Continuous Improvement
5.0 LOOKING FORWARD
6.0 INVESTMENT STRATEGY
- 6.1 Costs of the RTP
- 6.2 Three-Phased Approach to Investment
- 6.3 Investment Profile
- 6.4 Key Characteristics and Assumptions of the Investment Strategy
7.0 IMPLEMENTATION
- 7.1 Principles for Implementation
- 7.2 RTP Implementation
- 7.2.1 Status of the RTP
- 7.2.2 Benefits Case Analysis and Alternative Financing and Procurement
- 7.2.3 Capital Planning
- 7.2.4 Investment Strategy
- 7.2.5 Involving the Federal Government
- 7.2.6 Performance Standards
- 7.2.7 Land Use Planning
- 7.2.8 Environmental Assessment
- 7.2.9 Public Outreach
- 7.2.10 Monitoring Progress
- 7.2.11 Role of Metrolinx
8.0 GLOSSARY OF TERMS
9.0 SCHEDULES
- Schedule 1: 15-Year Plan for Regional Rapid Transit and Highway Network
link to interactive map - Schedule 2: 25-Year Plan for Regional Rapid Transit and Highway Network
link to interactive map - Schedule 3: Areas of Focus for Active Transportation
link to interactive map - Regional Rapid Transit and Highway Network
10.0 APPENDICES
- Appendix A: Existing Regional Rapid Transit and Highway Network in the GTHA
link to interactive map - Appendix B: Areas of Social Need in the GTHA
link to interactive map - Appendix C: Inter-Regional Rapid Transit Connections
link to interactive map - Appendix D: Metrolinx Quick Wins
link to interactive map - Appendix E: Photo Credits
Backgrounders
- Climate Change and Energy Conservation
link to PDF - Transit Technologies
link to PDF - Modelling Methodology and Results for the Regional Transportation Plan
link to PDF - Mobility Hubs
link to PDF
Research Studies
MESSAGE FROM THE CHAIR | 1.0 INTRODUCTION | 2.0 A VISION FOR THE FUTURE | 3.0 GOALS AND OBJECTIVES | 4.0 STRATEGIES | 5.0 LOOKING FORWARD | 6.0 INVESTMENT STRATEGY | 7.0 IMPLEMENTATION | 8.0 GLOSSARY OF TERMS | 9.0 SCHEDULES | 10.0 APPENDICES
Copyright © Metrolinx 2008 | Terms and Conditions of Use and Privacy Policy | Contact Webmaster
