• Text Size

Lincolnville layover and GO Station Improvements

Notice of Commencement - November 30, 2017

The purpose of the Lincolnville Layover and GO Station Improvements project is to support improved service on the Stouffville Rail Corridor with the addition of three layover tracks and enhancements to the existing station and layover infrastructure.
As part of the Project, Metrolinx will review the impacts of:

  • Layover expansion, including considerations for the needed upgrades; and
  • Possible relocation of the existing GO Station currently located at the Lincolnville Layover site.

Public Meeting #1 (October 26, 2017)
Notice of Public Meeting
Story Boards

Lincolnville Layover and GO Station Improvements - Feasibility Study Reports

Lincolnville Layover and GO Station Improvements - Draft Environmental Reports
A1 - Terrestrial Ecosystems Assessment Report
A2 - Fisheries Habitat Assessment Report
A3 - Stormwater Management Report
A4 - Hydrogeological Assessment Report
A5 - Soils Assessment Report
A6 - Tree Inventory and Arborist Report
A7 - Land Use Planning Assessment Report
A8 - Stage 1-2 Archaeological Assessment
A9 - Cultural Heritage Screening Report
A10 - Air Quality Evaluation Report
A11 - Noise and Vibration Assessment
A12 - Traffic and Transportation Impact Assessment

For more information or to be added to the study’s mailing list, please contact:

Lincolnville Layover and GO Station Improvements
c/o Georgina Collymore
Senior Advisor, Environmental Assessment Community Relations, Metrolinx
20 Bay Street, Suite 600
Toronto, ON M5J 2W3
tel: 416-202-4921
e-mail: lincolnville@metrolinx.com

Comments and information regarding this study are being collected to assist in meeting the requirements of the Environmental Assessment Act. The material will be maintained on file for use during the study and may be included in study documentation. With the exception of personal information, all comments will become part of the public record.