Guildwood to Pickering Project TPap

To support RER, improvements are needed between Guildwood and Pickering. Currently, there are two tracks between Galloway Road in Scarborough and Frenchman’s Bay in Pickering (“Durham Junction”) and this bottleneck creates an operational challenge for the entire line, meaning service isn’t as reliable or flexible as it could be.

An environmental assessment to add a third track on this section of the corridor was completed on January 11, 2017 using the streamlined Transit Project Assessment Process. With these approvals in place, Metrolinx can proceed with the improvements needed to increase service, including: adding a third track, widening two bridges, and performing three grade separations.

To stay up to date on the progress of this project, please visit the Lakeshore East corridor website.

Notice to Proceed
Statement of Completion

Lakeshore East Rail Corridor Expansion (Guildwood to Pickering) Environmental Project Report
Main Report
Appendix A1 - Design Plates
Appendix A2 - Renderings
Appendix B1 - Natural Environment Existing Conditions & Environmental Impact
Appendix B2 - Tree Inventory and Preservation Plan
Appendix B3 - Air Quality Assessment
Appendix B4 - Noise and Vibration Impact
Appendix B5 - Socio-Economic and Land Use Impact
Appendix B6 - Traffic Impact Study
Appendix B7 - Cultural Heritage Report
Appendix B8 - Stage 1 Archaeological Assessment
Appendix B9 - Stormwater Management and Drainage
Appendix C1 - Stakeholder Mailing List
Appendix C2 - Pre-TPAP Consultation
Appendix C3 - TPAP Consultation
Appendix C4 - Draft EPR Agency Comments and Metrolinx Responses

Notice of Commencement

Public Meeting #1 – March 2015
Notice of Public Meeting
Display Boards
Summary Report

Public Meeting #2 – May 2016
Notice of Public Meeting
Display Boards
Presentation
Roll Plans
Recap
Summary Report

Public Meeting #3 – September 2016
Notice of Public Meeting
Presentation
Recap

Archived E-Newsletters
07/07/2016 - Lakeshore East Rail Corridor Expansion (Guildwood to Pickering) Email Update
06/13/2016 - Lakeshore East Rail Corridor Expansion (Guildwood to Pickering) Email Update
05/27/2016 - Lakeshore East Rail Corridor Expansion (Guildwood to Pickering) Email Update
05/13/2016 - Lakeshore East Rail Corridor Expansion (Guildwood to Pickering) Public Meeting Notice #2

Comments invited

For more information or to be added to the study’s mailing list, please contact:

Guildwood to Pickering Project
c/o Georgina Collymore
Senior Advisor, Environmental Assessment Community Relations, Metrolinx
20 Bay Street, Suite 600
Toronto, ON M5J 2W3
tel: 416-202-4921
e-mail: guildwoodpickering@metrolinx.com

Comments and information regarding this study are being collected to assist in meeting the requirements of the Environmental Assessment Act. The material will be maintained on file for use during the study and may be included in study documentation. With the exception of personal information, all comments will become part of the public record.