• Text Size

Bloor-Lansdowne Station

 

This new GO station on the Barrie GO Rail Corridor will provide a critical link between GO RER and the TTC Line 2 subway at Lansdowne Station. An extension of the Barrie Corridor multi-use path will connect it to the popular West Toronto Railpath – providing an important new link in Toronto's cycling network.

This station will also be accessible from existing neighbourhoods on both the east and west, providing a link across the existing rail corridor.

Station Highlights: 
• Pedestrian and cycling access to the station will be provided from both sides of the rail corridor through public realm and tunnel enhancements.
• The station will have linkages with surrounding roadways including Bloor Street West, Lansdowne Avenue, and Sterling Road, as well as the West Toronto Railpath on the Kitchener GO Rail Corridor.
• Connections are planned with local transit routes to provide good station access for transferring passengers, including the 47 Lansdowne Bus.

If you have any questions about this station, please send an email to: BloorLansdowne@metrolinx.com

Comments and information regarding this study are being collected to assist in meeting the requirements of the Environmental Assessment Act. The material will be maintained on file for use during the study and may be included in study documentation. With the exception of personal information, all comments will become part of the public record.