Metrolinx - Regional Transportation Plan
 
Regional Transportation Plan

Shape Your Transportation Future: <A HREF="/en/Robsept2008.aspx">Draft RTP and IS September 2008 - Video Transcript</A> “The Big Move”: Implementing a Transportation Renaissance in the GTHA

The Metrolinx Board of Directors wasted no time in moving forward with implementing The Big Move: Transforming Transportation in the Greater Toronto and Hamilton Area (GTHA)." on Friday November 28, 2008. After unanimously approving the plan they immediately selected two major projects for construction beginning in 2009.

As part of its $7 B, five-year Capital Plan, Metrolinx has recommended construction funding for the Sheppard East LRT and dedicated VIVA lanes along Yonge Street and Highway 7 in York Region. These projects will connect the suburban regions of eastern Toronto and the northern area of the GTHA. Both projects are expected to begin construction next year at a cost of $2 B over five years.

More than 1,200 kilometres (km) of new rapid transit lines are planned in The Big Move. These lines will move people more conveniently and more quickly. More than 80 per cent of people in the GTHA will live within two km of rapid transit, compared to just 42 per cent currently. These additional transit choices will mean that there will be twice as many people taking transit each morning. And more than half of them will spend less than 45 minutes getting to their destination. Today, 38 per cent of people take more than 45 minutes to commute to work by transit.

The Big Move represents a fundamental shift — to make the entire transportation system in the GTHA more customer-centred, reliable and enjoyable.

The Big Move
Draft Regional Transportation Plan and Investment Strategy

Blank Filler ImageDraft Regional Transportation Plan - High Res (20 mb)
Blank Filler ImageDraft Regional Transportation Plan - Low Res (10 mb)
Blank Filler Image        Figure 2 Existing Regional Transit and Highway Network in the GTHA
Blank Filler Image        Figure 3 Areas of Social Need in the GTHA
Blank Filler Image        Figure 4 15-Year Plan for Regional Rapid Transit and Highway Improvements
Blank Filler Image        Figure 5 25-Year Plan for Regional Rapid Transit and Highway Improvements
Blank Filler Image        List of Projects
Blank Filler Image        Figure 6 Connections Beyond the GTHA
Blank Filler Image        Figure 7 Areas of Focus for Active Transportation
Blank Filler Image        Figure 8 Existing strategic goods movement network in the GTHA
Blank Filler ImageDraft Investment Strategy (1 mb)

Blank Filler ImageDraft RTP Backgrounders:
Blank Filler Image        Climate Change and Energy Conservation 
Blank Filler Image        Transit Technologies
Blank Filler Image        Modelling Methodology and Results for the Draft Regional Transportation Plan
Blank Filler Image        Mobility Hubs

White Papers
Green Papers
 
 
Home  |  Contact Us  |  Links  |  About Us  |  Careers  |  Photo Credits   |  Site Map  |